deedean thanks for the info and even though that's a picture of one of Egan's rigs on the website they are not using his rigs, keeping all contract services above board
All Egans rigs just happen to be in NZ ATM
Their RAB/AC rig is on a 6 wheeler truck and depth of drill for this varies between 15 to 40 metres
The RC rig they are using is the one shown above a Sandvic RCD250 and will be drilling the equivalent of vertically to 140 metres or 180 metres total depth on the angle
One really good thing is they are drilling now and expect results as soon as within the month, unlike CSD whose site is only 150 metres off the Kennedy Hwy and just too wet ATM, or like Baraka as the area they are drilling is even too boggy for any vehicles to navigate let alone heavy rigs
So all good as the RC rig is now on the job and doing the depth drills
- Forums
- ASX - By Stock
- yay, ann: drilling commences at barlee
deedean thanks for the info and even though that's a picture of...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.7¢ |
Change
0.001(3.85%) |
Mkt cap ! $101.4M |
Open | High | Low | Value | Volume |
2.6¢ | 2.7¢ | 2.6¢ | $27.55K | 1.059M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 896145 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.7¢ | 4992845 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 896145 | 0.026 |
3 | 1280000 | 0.025 |
7 | 1436582 | 0.024 |
6 | 1578479 | 0.023 |
3 | 1140000 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.027 | 4992845 | 5 |
0.028 | 9807869 | 6 |
0.029 | 1803903 | 6 |
0.030 | 6373835 | 14 |
0.031 | 1086276 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
BCN (ASX) Chart |