ASX & Media Release
Artemis-1 Progress Report No. 5
Key Points: Artemis-1 has been drilled to 2,936m An over-pressured gas zone encountered above the primary objective Well is presently circulating 11.0ppg mud to enable resumption of drilling operations
MELBOURNE, AUSTRALIA (6th December, 2010)
MEO Australia Limited (ASX: MEO; OTC: MEOAY) advises that since the last progress report, the BOPs have been run and tested. The 12- hole commenced drilling at 21:30 hrs (Perth time) on Friday 3rd December and has been drilled to a depth of 2,936m.
The well was shut in at 18:00 hrs on Sunday 5th December after encountering an over-pressured gas zone above the primary objective.
Present activity is circulating 11.0ppg mud to enable resumption of drilling operations including running the contingent 9-5/8 casing string before drilling ahead to the primary objective.
- Forums
- ASX - By Stock
- MEO
- you beauty!!!
you beauty!!!, page-6
-
- There are more pages in this discussion • 63 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online