BHP 0.07% $42.78 bhp group limited

Hi guys,There's a lot more information on this available online....

  1. jc1
    16 Posts.
    Hi guys,

    There's a lot more information on this available online. Key points are:

    Feasibility to be completed 2010.
    Mine potentially in operation in 2015.
    Will stretch existing block caving technologies to their absolute limit.
    Estimate over 1 billion tons at a grade of over 1.5% copper
    Deposit measures 1800 metres long, 1500 metres wide, 200-450 metres thick
    By 2015, Escondida and Bingham canyon will be in decline
    Some rail infrastructure already exists

    Read more at:
    http://www.theaustralian.news.com.au/common/story_page/0,5744,17949164%255E5001641,00.html
    http://www.redhawkresources.com/i/pdf/00433-reprint-jan9-041.pdf

    Regards,
    JC
 
watchlist Created with Sketch. Add BHP (ASX) to my watchlist
(20min delay)
Last
$42.78
Change
0.030(0.07%)
Mkt cap ! $216.9B
Open High Low Value Volume
$42.92 $43.08 $42.62 $778.2M 18.12M

Buyers (Bids)

No. Vol. Price($)
1 3000 $42.77
 

Sellers (Offers)

Price($) Vol. No.
$42.81 119112 3
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
BHP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.