Mt Lekoumou is on the licence and is the main area of drilling and will be the area of the resource
Lekoumou is the drilled prospect on the Mayoko Project
The expln target of 750-800Mt is all on the Mayoko licence
- Forums
- ASX - By Stock
- DMM
- zanzibar you are incorrect
zanzibar you are incorrect
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DMM (ASX) to my watchlist
|
|||||
Last
5.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.688M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DMM (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online