Wednesday 24th October, 2007
ASX Announcement
Further high grade gold intercepts from Sub Sahara’s Zara Gold
Project in Eritrea
Results from diamond drilling (ZARD062 – ZARD71) at Sub Sahara Resources’ (AXSSBS)
Koka prospect (Zara Project), in Eritrea, have returned further significant high
grade gold intercepts. Infill drilling of the Koka discovery has continued to identify high
grade gold and broad zones of gold mineralisation as part of an on-going resource
definition drilling programme (Figure 1).
Drilling highlights:
Hole From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
ZARD062 54 57.9 3.9 65.10
ZARD064 53 58 5 8.59
ZARD065 117 121 4 9.48
ZARD067 33 37 4 21.37
134 138 4 59.89
ZARD069 148 153 5 367.71
INCLUDING 1 1,652.33
ZARD070 38 51 13 57.24
ZARD071 130 134 4 43.49
Sub Sahara Managing Director Michael Griffiths said, “Koka is shaping up very well for
Sub-Sahara. These latest drilling results from the infill drilling at the Koka gold deposit
have added further significant gold to the deposit inventory. Our drilling is returning
consistent high grade gold values and we expect further good results from the recently
completed drill out phase.”
“All the drilling required to complete the next resource estimate has now been completed
and the remaining assays are in the pipeline. The estimate remains on track and is
scheduled for completion by the end of December 2007.”
For personal use only
Add to My Watchlist
What is My Watchlist?