The price drop was driven by an unexpected glut of renewable energy and Finns cutting back on energy use because of the crisis caused by Russia's invasion of Ukraine.
Because hydropower cannot be slowed down or turned off, other producers like nuclear are looking to dial back their production to avoid losing money on energy production.
Olkiluto 3 cost $17BN AUS and building it ran 13 years behind schedule. Nearly 20 years to build.
- Forums
- Political Debate
- Zoe Daniel explains why Duttons plan is not credible
The price drop was driven by an unexpected glut of renewable...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)