drilling in the US must be very close. Next 2 weeks you would think. 60 days with oil shows along the way.PEL 105 could follow if the cooper basin drys up a bit.Dont let this market correction fool you into believing the story has changed here.
AHK Ark Mines inks 1.5Bt Exploration Target for Sandy Mitchell REE play including NdPr; PFS due in Q4