CKG Drilling results! - up to 23.2g/t Au

  1. 29,310 Posts.
    lightbulb Created with Sketch. 80
    CKG just released drilling results from their Eureka prospect.
    Early days yet, but looks potentially prospective enough to support a cut-back and re-open the old Eureka pit.
    A good speccy punt at 2.9c/share.

    GZ
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.