• Viewed 10,240 times by 3014 users (Last 30 days)
  • print Created with Sketch. Print
NHE 5.80% 6.5¢

NOBLE HELIUM LIMITED - Announcements

Noble Helium Limited is an Australia-based company, which is engaged in the exploration... Noble Helium Limited is an Australia-based company, which is engaged in the exploration of resource projects in the United Republic of Tanzania. The Company's projects include North Rukwa Helium Project, North Nyasa Project, Eyasi Basin and Manyara Basin. The North Rukwa Project is the Company's flagship project located in the Rukwa Basin in southwest Tanzania, which comprises approximately twelve granted prospecting licenses (PL) covering a combined area of 1,467 square kilometers (km2). The North Rukwa Project has an independently certified, summed unrisked mean prospective helium resource of approximately 176 billion cubic feet (Bcf). The North Nyasa Project holds two PL totaling 466 km2 in the North Basin of the Nyasa (Malawi) Rift area. The Eyasi and Manyara Projects have approximately five PL, covering 1,138 km2 in the Eyasi Basin and four PLs applications, covering 855 km2 in the Manyara Basin, both located in central northern Tanzania.More

Announcements


Filters [Clear]
  • Price Sensitive: Yes
NHE Option ProspectusPRICE SENSITIVE15/05/24 download Created with Sketch. 399.01KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE30/04/24 download Created with Sketch. 1.41MB
NHE Share Purchase PlanPRICE SENSITIVE11/04/24 download Created with Sketch. 362.51KB
NHE Mbelele gas cap zone shows increasing production potentialPRICE SENSITIVE09/04/24 download Created with Sketch. 263.22KB
NHE Noble Helium leadership changesPRICE SENSITIVE07/03/24 download Created with Sketch. 523.03KB
NHE Significant probable free gas cap at MbelelePRICE SENSITIVE05/03/24 download Created with Sketch. 1002.61KB
NHE Mbelele lab results confirm high helium concentrationsPRICE SENSITIVE07/02/24 download Created with Sketch. 718.93KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE31/01/24 download Created with Sketch. 1.66MB
NHE Lab Testing UpdatePRICE SENSITIVE18/01/24 download Created with Sketch. 133.64KB
NHE Noble Helium raises $14m for Mbelele Appraisal & TestingPRICE SENSITIVE12/12/23 download Created with Sketch. 387.09KB
NHE Trading HaltPRICE SENSITIVE08/12/23 download Created with Sketch. 140.88KB
NHE Mbelele results clarificationPRICE SENSITIVE06/12/23 download Created with Sketch. 360.52KB
NHE Mbelele-2 results point to prolific new helium provincePRICE SENSITIVE04/12/23 download Created with Sketch. 482.31KB
NHE Project UpdatesPRICE SENSITIVE27/11/23 download Created with Sketch. 421.84KB
NHE Drilling Commences at Mbelele-2PRICE SENSITIVE16/11/23 download Created with Sketch. 564.49KB
NHE Mbelele-2 Operations UpdatePRICE SENSITIVE13/11/23 download Created with Sketch. 409.79KB
NHE Mbelele-1 preliminary results point toward Helium DiscoveryPRICE SENSITIVE06/11/23 download Created with Sketch. 879.22KB
NHE Mbelele-1 Update ClarificationPRICE SENSITIVE02/11/23 download Created with Sketch. 513.53KB
NHE Mbelele-1 Reaches TDPRICE SENSITIVE02/11/23 download Created with Sketch. 363.04KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE31/10/23 download Created with Sketch. 2.71MB
NHE Mbelele-1 tophole heliumPRICE SENSITIVE30/10/23 download Created with Sketch. 429.46KB
NHE Drilling commences at Mbelele-1PRICE SENSITIVE27/10/23 download Created with Sketch. 560.88KB
NHE Rig 16 Ready to Commence DrillingPRICE SENSITIVE23/10/23 download Created with Sketch. 1MB
NHE Marriott Rig repairedPRICE SENSITIVE10/10/23 download Created with Sketch. 405.62KB
NHE Rig up continues at Mbelele-1, North Rukwa ProjectPRICE SENSITIVE05/10/23 download Created with Sketch. 1.88MB
NHE Rig up underway at Mbelele-1, North Rukwa ProjectPRICE SENSITIVE28/09/23 download Created with Sketch. 447.01KB
NHE Drilling rig on site at Mbelele, North Rukwa ProjectPRICE SENSITIVE21/09/23 download Created with Sketch. 1.19MB
NHE Operations UpdatePRICE SENSITIVE14/09/23 download Created with Sketch. 1.38MB
NHE Marriott Rig arrives in TanzaniaPRICE SENSITIVE08/09/23 download Created with Sketch. 534.88KB
NHE New Ngambwa Lead at North Rukwa ProjectPRICE SENSITIVE06/09/23 download Created with Sketch. 446KB
NHE Marriott Rig UpdatePRICE SENSITIVE31/08/23 download Created with Sketch. 452.42KB
NHE Marriott Rig UpdatePRICE SENSITIVE23/08/23 download Created with Sketch. 423.95KB
NHE Noble Helium raises $12 million for second North Rukwa wellPRICE SENSITIVE18/08/23 download Created with Sketch. 424.72KB
NHE Trading HaltPRICE SENSITIVE17/08/23 download Created with Sketch. 141.17KB
NHE Operations UpdatePRICE SENSITIVE15/08/23 download Created with Sketch. 1.2MB
NHE Marriott Rig leaves UK bound for TanzaniaPRICE SENSITIVE11/08/23 download Created with Sketch. 1.17MB
NHE Marriott Rig mobilising for North RukwaPRICE SENSITIVE02/08/23 download Created with Sketch. 413.77KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE28/07/23 download Created with Sketch. 1.79MB
NHE Mbelele Resource IncreasePRICE SENSITIVE25/07/23 download Created with Sketch. 1.08MB
NHE Drilling Program on Track for Q3 SpudPRICE SENSITIVE19/07/23 download Created with Sketch. 441.17KB
NHE Rig secured for North Rukwa Project drilling campaignPRICE SENSITIVE07/07/23 download Created with Sketch. 428.19KB
NHE Tanzanian Government renews North Rukwa Prospecting LicencesPRICE SENSITIVE14/06/23 download Created with Sketch. 508.39KB
NHE $13.5 million Placement for Drilling at North Rukwa ProjectPRICE SENSITIVE05/06/23 download Created with Sketch. 411.56KB
NHE Trading HaltPRICE SENSITIVE01/06/23 download Created with Sketch. 493.32KB
NHE North Rukwa Project Operational UpdatePRICE SENSITIVE22/05/23 download Created with Sketch. 1.97MB
NHE Preferred Bidder Selected for North Rukwa FarmoutPRICE SENSITIVE01/05/23 download Created with Sketch. 295.3KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE28/04/23 download Created with Sketch. 1.02MB
NHE String of Pearls emerge in North RukwaPRICE SENSITIVE20/04/23 download Created with Sketch. 2.02MB
NHE LOI signed with Sofori ahead of maiden drill program Q3 2023PRICE SENSITIVE06/04/23 download Created with Sketch. 433.47KB
NHE North Rukwa Farm-In Proceeds to Phase 2 with Strong InterestPRICE SENSITIVE05/04/23 download Created with Sketch. 430.8KB
NHE Two targets identified for maiden drilling program Q3 2023PRICE SENSITIVE23/03/23 download Created with Sketch. 1.2MB
NHE Rukwa Operations UpdatePRICE SENSITIVE23/02/23 download Created with Sketch. 761.02KB
NHE 3D Seismic Recommences Ahead of Drilling in Q3PRICE SENSITIVE02/02/23 download Created with Sketch. 438.02KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE31/01/23 download Created with Sketch. 1.33MB
NHE 2022 Operational Review & 2023 Forward PlansPRICE SENSITIVE19/12/22 download Created with Sketch. 940.83KB
NHE Helium Anomalies Confirmed at North NyasaPRICE SENSITIVE28/11/22 download Created with Sketch. 477.1KB
NHE 3D SEISMIC SURVEYS UPDATEPRICE SENSITIVE03/11/22 download Created with Sketch. 713.93KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE28/10/22 download Created with Sketch. 1.17MB
NHE Noble Helium to Raise $6.1M via Oversubscribed PlacementPRICE SENSITIVE27/10/22 download Created with Sketch. 466.27KB
NHE Trading HaltPRICE SENSITIVE25/10/22 download Created with Sketch. 527.24KB
NHE 3D Seismic Surveys Kachinga LeadPRICE SENSITIVE24/10/22 download Created with Sketch. 582.91KB
NHE North Nyasa Soil Gas Survey CommencedPRICE SENSITIVE18/10/22 download Created with Sketch. 677.04KB
NHE Loyalty Options ProspectusPRICE SENSITIVE10/10/22 download Created with Sketch. 474.87KB
NHE 3D Seismic Survey UnderwayPRICE SENSITIVE28/09/22 download Created with Sketch. 615.08KB
NHE Entitlement Issue of Loyalty OptionsPRICE SENSITIVE27/09/22 download Created with Sketch. 176.42KB
NHE North Rukwa Landholding ExpandsPRICE SENSITIVE21/09/22 download Created with Sketch. 366.04KB
NHE Substantial Increase In LandholdingPRICE SENSITIVE15/09/22 download Created with Sketch. 690.85KB
NHE North Rukwa Farmout Process CommencesPRICE SENSITIVE05/09/22 download Created with Sketch. 329.94KB
NHE AGG Program Completed & Soil Gas Survey Well AdvancedPRICE SENSITIVE22/08/22 download Created with Sketch. 334.48KB
NHE AGG & Magnetics Program Commenced Over North RukwaPRICE SENSITIVE09/08/22 download Created with Sketch. 424.84KB
NHE North Rukwa Operational UpdatePRICE SENSITIVE01/08/22 download Created with Sketch. 595.74KB
NHE Quarterly Activities/Appendix 5B Cash Flow ReportPRICE SENSITIVE29/07/22 download Created with Sketch. 1.14MB
NHE 3D Seismic Contract ExecutedPRICE SENSITIVE20/06/22 download Created with Sketch. 444.15KB
NHE Global Helium Atlas LicencePRICE SENSITIVE26/05/22 download Created with Sketch. 471.61KB
NHE Approval to Commence AGG & Magnetics ProgramPRICE SENSITIVE09/05/22 download Created with Sketch. 244.1KB
NHE Option Prospectus
15/05/24PRICE SENSITIVE download Created with Sketch. 399.01KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
30/04/24PRICE SENSITIVE download Created with Sketch. 1.41MB
NHE Share Purchase Plan
11/04/24PRICE SENSITIVE download Created with Sketch. 362.51KB
NHE Mbelele gas cap zone shows increasing production potential
09/04/24PRICE SENSITIVE download Created with Sketch. 263.22KB
NHE Noble Helium leadership changes
07/03/24PRICE SENSITIVE download Created with Sketch. 523.03KB
NHE Significant probable free gas cap at Mbelele
05/03/24PRICE SENSITIVE download Created with Sketch. 1002.61KB
NHE Mbelele lab results confirm high helium concentrations
07/02/24PRICE SENSITIVE download Created with Sketch. 718.93KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
31/01/24PRICE SENSITIVE download Created with Sketch. 1.66MB
NHE Lab Testing Update
18/01/24PRICE SENSITIVE download Created with Sketch. 133.64KB
NHE Noble Helium raises $14m for Mbelele Appraisal & Testing
12/12/23PRICE SENSITIVE download Created with Sketch. 387.09KB
NHE Trading Halt
08/12/23PRICE SENSITIVE download Created with Sketch. 140.88KB
NHE Mbelele results clarification
06/12/23PRICE SENSITIVE download Created with Sketch. 360.52KB
NHE Mbelele-2 results point to prolific new helium province
04/12/23PRICE SENSITIVE download Created with Sketch. 482.31KB
NHE Project Updates
27/11/23PRICE SENSITIVE download Created with Sketch. 421.84KB
NHE Drilling Commences at Mbelele-2
16/11/23PRICE SENSITIVE download Created with Sketch. 564.49KB
NHE Mbelele-2 Operations Update
13/11/23PRICE SENSITIVE download Created with Sketch. 409.79KB
NHE Mbelele-1 preliminary results point toward Helium Discovery
06/11/23PRICE SENSITIVE download Created with Sketch. 879.22KB
NHE Mbelele-1 Update Clarification
02/11/23PRICE SENSITIVE download Created with Sketch. 513.53KB
NHE Mbelele-1 Reaches TD
02/11/23PRICE SENSITIVE download Created with Sketch. 363.04KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
31/10/23PRICE SENSITIVE download Created with Sketch. 2.71MB
NHE Mbelele-1 tophole helium
30/10/23PRICE SENSITIVE download Created with Sketch. 429.46KB
NHE Drilling commences at Mbelele-1
27/10/23PRICE SENSITIVE download Created with Sketch. 560.88KB
NHE Rig 16 Ready to Commence Drilling
23/10/23PRICE SENSITIVE download Created with Sketch. 1MB
NHE Marriott Rig repaired
10/10/23PRICE SENSITIVE download Created with Sketch. 405.62KB
NHE Rig up continues at Mbelele-1, North Rukwa Project
05/10/23PRICE SENSITIVE download Created with Sketch. 1.88MB
NHE Rig up underway at Mbelele-1, North Rukwa Project
28/09/23PRICE SENSITIVE download Created with Sketch. 447.01KB
NHE Drilling rig on site at Mbelele, North Rukwa Project
21/09/23PRICE SENSITIVE download Created with Sketch. 1.19MB
NHE Operations Update
14/09/23PRICE SENSITIVE download Created with Sketch. 1.38MB
NHE Marriott Rig arrives in Tanzania
08/09/23PRICE SENSITIVE download Created with Sketch. 534.88KB
NHE New Ngambwa Lead at North Rukwa Project
06/09/23PRICE SENSITIVE download Created with Sketch. 446KB
NHE Marriott Rig Update
31/08/23PRICE SENSITIVE download Created with Sketch. 452.42KB
NHE Marriott Rig Update
23/08/23PRICE SENSITIVE download Created with Sketch. 423.95KB
NHE Noble Helium raises $12 million for second North Rukwa well
18/08/23PRICE SENSITIVE download Created with Sketch. 424.72KB
NHE Trading Halt
17/08/23PRICE SENSITIVE download Created with Sketch. 141.17KB
NHE Operations Update
15/08/23PRICE SENSITIVE download Created with Sketch. 1.2MB
NHE Marriott Rig leaves UK bound for Tanzania
11/08/23PRICE SENSITIVE download Created with Sketch. 1.17MB
NHE Marriott Rig mobilising for North Rukwa
02/08/23PRICE SENSITIVE download Created with Sketch. 413.77KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
28/07/23PRICE SENSITIVE download Created with Sketch. 1.79MB
NHE Mbelele Resource Increase
25/07/23PRICE SENSITIVE download Created with Sketch. 1.08MB
NHE Drilling Program on Track for Q3 Spud
19/07/23PRICE SENSITIVE download Created with Sketch. 441.17KB
NHE Rig secured for North Rukwa Project drilling campaign
07/07/23PRICE SENSITIVE download Created with Sketch. 428.19KB
NHE Tanzanian Government renews North Rukwa Prospecting Licences
14/06/23PRICE SENSITIVE download Created with Sketch. 508.39KB
NHE $13.5 million Placement for Drilling at North Rukwa Project
05/06/23PRICE SENSITIVE download Created with Sketch. 411.56KB
NHE Trading Halt
01/06/23PRICE SENSITIVE download Created with Sketch. 493.32KB
NHE North Rukwa Project Operational Update
22/05/23PRICE SENSITIVE download Created with Sketch. 1.97MB
NHE Preferred Bidder Selected for North Rukwa Farmout
01/05/23PRICE SENSITIVE download Created with Sketch. 295.3KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
28/04/23PRICE SENSITIVE download Created with Sketch. 1.02MB
NHE String of Pearls emerge in North Rukwa
20/04/23PRICE SENSITIVE download Created with Sketch. 2.02MB
NHE LOI signed with Sofori ahead of maiden drill program Q3 2023
06/04/23PRICE SENSITIVE download Created with Sketch. 433.47KB
NHE North Rukwa Farm-In Proceeds to Phase 2 with Strong Interest
05/04/23PRICE SENSITIVE download Created with Sketch. 430.8KB
NHE Two targets identified for maiden drilling program Q3 2023
23/03/23PRICE SENSITIVE download Created with Sketch. 1.2MB
NHE Rukwa Operations Update
23/02/23PRICE SENSITIVE download Created with Sketch. 761.02KB
NHE 3D Seismic Recommences Ahead of Drilling in Q3
02/02/23PRICE SENSITIVE download Created with Sketch. 438.02KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
31/01/23PRICE SENSITIVE download Created with Sketch. 1.33MB
NHE 2022 Operational Review & 2023 Forward Plans
19/12/22PRICE SENSITIVE download Created with Sketch. 940.83KB
NHE Helium Anomalies Confirmed at North Nyasa
28/11/22PRICE SENSITIVE download Created with Sketch. 477.1KB
NHE 3D SEISMIC SURVEYS UPDATE
03/11/22PRICE SENSITIVE download Created with Sketch. 713.93KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
28/10/22PRICE SENSITIVE download Created with Sketch. 1.17MB
NHE Noble Helium to Raise $6.1M via Oversubscribed Placement
27/10/22PRICE SENSITIVE download Created with Sketch. 466.27KB
NHE Trading Halt
25/10/22PRICE SENSITIVE download Created with Sketch. 527.24KB
NHE 3D Seismic Surveys Kachinga Lead
24/10/22PRICE SENSITIVE download Created with Sketch. 582.91KB
NHE North Nyasa Soil Gas Survey Commenced
18/10/22PRICE SENSITIVE download Created with Sketch. 677.04KB
NHE Loyalty Options Prospectus
10/10/22PRICE SENSITIVE download Created with Sketch. 474.87KB
NHE 3D Seismic Survey Underway
28/09/22PRICE SENSITIVE download Created with Sketch. 615.08KB
NHE Entitlement Issue of Loyalty Options
27/09/22PRICE SENSITIVE download Created with Sketch. 176.42KB
NHE North Rukwa Landholding Expands
21/09/22PRICE SENSITIVE download Created with Sketch. 366.04KB
NHE Substantial Increase In Landholding
15/09/22PRICE SENSITIVE download Created with Sketch. 690.85KB
NHE North Rukwa Farmout Process Commences
05/09/22PRICE SENSITIVE download Created with Sketch. 329.94KB
NHE AGG Program Completed & Soil Gas Survey Well Advanced
22/08/22PRICE SENSITIVE download Created with Sketch. 334.48KB
NHE AGG & Magnetics Program Commenced Over North Rukwa
09/08/22PRICE SENSITIVE download Created with Sketch. 424.84KB
NHE North Rukwa Operational Update
01/08/22PRICE SENSITIVE download Created with Sketch. 595.74KB
NHE Quarterly Activities/Appendix 5B Cash Flow Report
29/07/22PRICE SENSITIVE download Created with Sketch. 1.14MB
NHE 3D Seismic Contract Executed
20/06/22PRICE SENSITIVE download Created with Sketch. 444.15KB
NHE Global Helium Atlas Licence
26/05/22PRICE SENSITIVE download Created with Sketch. 471.61KB
NHE Approval to Commence AGG & Magnetics Program
09/05/22PRICE SENSITIVE download Created with Sketch. 244.1KB
(20min delay)
Last
6.5¢
Change
-0.004(5.80%)
Mkt cap ! $30.85M
Open High Low Value Volume
7.0¢ 7.0¢ 6.5¢ $71.73K 1.073M

Buyers (Bids)

No. Vol. Price($)
1 5000 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 127851 1
View Market Depth
Last trade - 15.29pm 27/05/2024 (20 minute delay) ?
Last
6.5¢
  Change
-0.004 ( 5.80 %)
Open High Low Volume
6.9¢ 7.0¢ 6.5¢ 226851
Last updated 12.43pm 27/05/2024 ?
NHE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.