• Viewed 10,240 times by 3014 users (Last 30 days)
  • print Created with Sketch. Print
POS 0.00% 0.4¢

POSEIDON NICKEL LIMITED - Announcements

Poseidon Nickel Limited is a nickel sulfide exploration and development company. The... Poseidon Nickel Limited is a nickel sulfide exploration and development company. The Company has three projects located within a radius of 300 kilometers (km) from Kalgoorlie in the Goldfields region of Western Australia and a resource base of over 420,000 tons of nickel and 180,000 ounces of gold. It owns the Black Swan, Lake Johnston and Windarra Nickel Projects. The Black Swan Project is located approximately 600 km east of Perth and 50 km northeast of Kalgoorlie, Western Australia. Its operations include the Silver Swan underground mine, Black Swan open pit, a 2.2 metric tons per annum (Mtpa) nickel sulfide concentrator and associated infrastructure. The Mt Windarra Nickel Project is located in the Mt Margaret Goldfields of Western Australia and is situated about 25 km north-west of Laverton. The Windarra Gold Tailings Project is located over 720 km north-east of Perth, 260 km north-north-east of the major mining town of Kalgoorlie, and about 18 km north-west of Laverton.More

Announcements


POS Change of Director's Interest Notice for Mr Braysahw18/12/15 download Created with Sketch. 293.38KB
POS Change of Director's Interest Notice for Mr Indermaur18/12/15 download Created with Sketch. 293.82KB
POS Appendix 3B18/12/15 download Created with Sketch. 482.71KB
POS January 2016 Notice of General Meeting18/12/15 download Created with Sketch. 174.67KB
POS Independent Expert Report to Accompany Notice of Meeting18/12/15 download Created with Sketch. 336.67KB
POS Ceasing to be a Substantial Holder from POS16/12/15 download Created with Sketch. 146.65KB
POS Change in substantial holding from POS04/12/15 download Created with Sketch. 112.04KB
POS Change of Company Secretary27/11/15 download Created with Sketch. 31.38KB
POS 2015 Annual General Meeting Results26/11/15 download Created with Sketch. 244.52KB
POS Presentation to Shareholders at 2015 Annual General Meeting26/11/15 download Created with Sketch. 1.94MB
POS Silver Swan Offtake Contract SignedPRICE SENSITIVE24/11/15 download Created with Sketch. 125.21KB
POS Exploration Drilling at Lake JohnstonPRICE SENSITIVE17/11/15 download Created with Sketch. 124KB
POS Resource Estimate for the World's Highest Grade Nickel MinePRICE SENSITIVE12/11/15 download Created with Sketch. 1.06MB
POS Renegotiation of convertible notesPRICE SENSITIVE04/11/15 download Created with Sketch. 43.33KB
POS Becoming a Substantial Holder from POS29/10/15 download Created with Sketch. 116.61KB
POS Acquisition of Port Exploration Pty LtdPRICE SENSITIVE28/10/15 download Created with Sketch. 295.4KB
POS Notice of Annual General Meeting27/10/15 download Created with Sketch. 555.39KB
POS Annual Report to shareholders27/10/15 download Created with Sketch. 4.15MB
POS Quarterly Report to 30 September 2015PRICE SENSITIVE27/10/15 download Created with Sketch. 1012.04KB
POS Change in substantial holding14/10/15 download Created with Sketch. 79.2KB
POS Amended Appendix 3B13/10/15 download Created with Sketch. 345.76KB
POS Appendix 3B12/10/15 download Created with Sketch. 345.75KB
POS Australian Nickel Conference Presentation 201508/10/15 download Created with Sketch. 3MB
POS Notification to accompany Appendix 3B14/09/15 download Created with Sketch. 34.21KB
POS Appendix 3B14/09/15 download Created with Sketch. 370.03KB
POS Silver Swan and Funds ReceivedPRICE SENSITIVE14/09/15 download Created with Sketch. 399.5KB
POS Update on Silver Swan & Cancellation of General MeetingPRICE SENSITIVE11/09/15 download Created with Sketch. 96.43KB
POS Appendix 4G and Corporate Governance Statement03/09/15 download Created with Sketch. 191.18KB
POS Annual Financial Report to 30 June 201503/09/15 download Created with Sketch. 923.17KB
POS Extension of Completion DatePRICE SENSITIVE28/07/15 download Created with Sketch. 94.96KB
POS Extension to Silver Swan CompletionPRICE SENSITIVE28/07/15 download Created with Sketch. 32.45KB
POS Concentrate Deliveries and Operational Cost ReductionPRICE SENSITIVE16/07/15 download Created with Sketch. 39.69KB
POS Quarterly Report to 30 June 2015PRICE SENSITIVE09/07/15 download Created with Sketch. 1.79MB
POS Appendix 3B07/07/15 download Created with Sketch. 74.16KB
POS Appendix 3Y Mr Dennis07/07/15 download Created with Sketch. 195.19KB
POS Appendix 3Y Mr Brayshaw07/07/15 download Created with Sketch. 193.86KB
POS Appendix 3Y Mr Indermaur07/07/15 download Created with Sketch. 195.86KB
POS Maggie Hays Mt Windarra Ore ReservePRICE SENSITIVE06/07/15 download Created with Sketch. 1.76MB
POS Appendix 3B30/06/15 download Created with Sketch. 351.31KB
POS Change of registry address12/06/15 download Created with Sketch. 20.69KB
POS Change of Share Registry Address12/06/15 download Created with Sketch. 20.69KB
POS Approval for Windarra Processing at Black SwanPRICE SENSITIVE09/06/15 download Created with Sketch. 120.27KB
POS Caeneus Minerals acquires rights to mine at Silver SwanPRICE SENSITIVE21/05/15 download Created with Sketch. 623.07KB
POS Poseidon enters into an agreement with Caeneus MineralsPRICE SENSITIVE20/05/15 download Created with Sketch. 114.13KB
POS Sale of Nickel Concentrate from Lake JohnstonPRICE SENSITIVE19/05/15 download Created with Sketch. 27.34KB
POS Lake Johnston Bankable Feasibility Report Supports RestartPRICE SENSITIVE18/05/15 download Created with Sketch. 1.3MB
POS Quarterly Report to 31 March 2015PRICE SENSITIVE30/04/15 download Created with Sketch. 1.07MB
POS Appendix 3B17/04/15 download Created with Sketch. 75.69KB
POS Appendix 3Y Mr Dennis16/04/15 download Created with Sketch. 23.6KB
POS Appendix 3Y Mr Brayshaw16/04/15 download Created with Sketch. 25.23KB
POS Appendix 3Y Mr Indermaur16/04/15 download Created with Sketch. 24.21KB
POS Poseidon Completes Purchase of Black SwanPRICE SENSITIVE30/03/15 download Created with Sketch. 2.08MB
POS New Appointments24/03/15 download Created with Sketch. 30.14KB
POS 50% Increase in Indicated Resources at Lake JohnstonPRICE SENSITIVE17/03/15 download Created with Sketch. 261.05KB
POS Interim Financial Report to 31 December 201412/03/15 download Created with Sketch. 1.12MB
MPL +S&P DJ Indices Announces March Quarterly ReviewPRICE SENSITIVE06/03/15 download Created with Sketch. 100.19KB
POS High Grade Intersection at Mt WindarraPRICE SENSITIVE05/03/15 download Created with Sketch. 931.43KB
POS New Mineralised Zone Identified at Lake JohnstonPRICE SENSITIVE18/02/15 download Created with Sketch. 863.3KB
POS Quartrerly Report to 31 December 2014PRICE SENSITIVE02/02/15 download Created with Sketch. 1.12MB
POS Major Resource Upgrade at Lake JohnstonPRICE SENSITIVE29/01/15 download Created with Sketch. 541.65KB
POS Appendix 3B12/01/15 download Created with Sketch. 370.31KB
POS Appendix 3Y Mr Dennis12/01/15 download Created with Sketch. 194.96KB
POS Appendix 3Y Mr Brayshaw12/01/15 download Created with Sketch. 197.45KB
POS Appendix 3Y Mr Indermaur12/01/15 download Created with Sketch. 195.61KB
POS Updated Timetable for the Aquisition of Black Swan Project18/12/14 download Created with Sketch. 28.11KB
POS Lake Johnston Restart Feasibility StudyPRICE SENSITIVE16/12/14 download Created with Sketch. 927.51KB
POS Appendix 3Y - Mr Dennis15/12/14 download Created with Sketch. 196.61KB
POS Appendix 3Y - Mr Indermaur15/12/14 download Created with Sketch. 195.72KB
POS Appendix 3Y - Mr Brayshaw15/12/14 download Created with Sketch. 197.47KB
POS Appendix 3Y Mr Singleton15/12/14 download Created with Sketch. 259.28KB
POS Appendix 3B15/12/14 download Created with Sketch. 372.69KB
POS Poseidon Announces Maggie Hays Mineral ResourcePRICE SENSITIVE09/12/14 download Created with Sketch. 389.1KB
POS Change in substantial holding08/12/14 download Created with Sketch. 78.22KB
POS Appendix 3B for 2nd Tranche Placement05/12/14 download Created with Sketch. 132.47KB
POS Cleansing Prospectus02/12/14 download Created with Sketch. 361.17KB
POS Addendum to the 2014 Annual Report28/11/14 download Created with Sketch. 120.57KB
POS Results of 2014 General Meeting26/11/14 download Created with Sketch. 147.1KB
POS Results of 2014 Annual General Meeting26/11/14 download Created with Sketch. 166.39KB
POS Presentation at the 2014 Annual General Meeting26/11/14 download Created with Sketch. 5.68MB
POS Recommencement of Drilling at WindarraPRICE SENSITIVE24/11/14 download Created with Sketch. 124.14KB
POS Poseidon Completes Lake Johnston PurchasePRICE SENSITIVE13/11/14 download Created with Sketch. 1.09MB
POS Appendix 3B for the Issue of Performance Bonus Shares12/11/14 download Created with Sketch. 309.49KB
POS Revised Mt Windarra Mineral ResourcePRICE SENSITIVE07/11/14 download Created with Sketch. 459.21KB
POS Black Swan Ore Reserve - ASX Request Revised Format06/11/14 download Created with Sketch. 905.01KB
POS Poseidon Announces Black Swan Ore ReservePRICE SENSITIVE05/11/14 download Created with Sketch. 893.36KB
POS Quarterly Report to 30 September 2014PRICE SENSITIVE29/10/14 download Created with Sketch. 1.1MB
POS 2014 Annual Report24/10/14 download Created with Sketch. 2.49MB
POS Notice of General Meeting24/10/14 download Created with Sketch. 370.55KB
POS Notice of Annual General Meeting24/10/14 download Created with Sketch. 441.14KB
POS Change in substantial holding22/10/14 download Created with Sketch. 704.41KB
POS Information Required under ASX Listing Rule 3.10.5A16/10/14 download Created with Sketch. 95.74KB
POS Appendix 3B for Tranche 1 Placement16/10/14 download Created with Sketch. 309.07KB
POS Cleansing ProspectusPRICE SENSITIVE15/10/14 download Created with Sketch. 343.83KB
POS Completion of $30 Million Oversubscribed PlacementPRICE SENSITIVE10/10/14 download Created with Sketch. 33.43KB
POS Trading HaltPRICE SENSITIVE08/10/14 download Created with Sketch. 179.4KB
POS Presentation at Nickel Conference02/10/14 download Created with Sketch. 2.48MB
POS Nickel Offtake Agreement SignedPRICE SENSITIVE02/10/14 download Created with Sketch. 258.95KB
POS Appendix 3B01/10/14 download Created with Sketch. 342.19KB
POS June 2014 Annual Report26/09/14 download Created with Sketch. 1.72MB
POS Loan Facility ExtensionPRICE SENSITIVE17/09/14 download Created with Sketch. 31.39KB
POS Change of Director's Interest Notice for Mr Braysahw
18/12/15 download Created with Sketch. 293.38KB
POS Change of Director's Interest Notice for Mr Indermaur
18/12/15 download Created with Sketch. 293.82KB
POS Appendix 3B
18/12/15 download Created with Sketch. 482.71KB
POS January 2016 Notice of General Meeting
18/12/15 download Created with Sketch. 174.67KB
POS Independent Expert Report to Accompany Notice of Meeting
18/12/15 download Created with Sketch. 336.67KB
POS Ceasing to be a Substantial Holder from POS
16/12/15 download Created with Sketch. 146.65KB
POS Change in substantial holding from POS
04/12/15 download Created with Sketch. 112.04KB
POS Change of Company Secretary
27/11/15 download Created with Sketch. 31.38KB
POS 2015 Annual General Meeting Results
26/11/15 download Created with Sketch. 244.52KB
POS Presentation to Shareholders at 2015 Annual General Meeting
26/11/15 download Created with Sketch. 1.94MB
POS Silver Swan Offtake Contract Signed
24/11/15PRICE SENSITIVE download Created with Sketch. 125.21KB
POS Exploration Drilling at Lake Johnston
17/11/15PRICE SENSITIVE download Created with Sketch. 124KB
POS Resource Estimate for the World's Highest Grade Nickel Mine
12/11/15PRICE SENSITIVE download Created with Sketch. 1.06MB
POS Renegotiation of convertible notes
04/11/15PRICE SENSITIVE download Created with Sketch. 43.33KB
POS Becoming a Substantial Holder from POS
29/10/15 download Created with Sketch. 116.61KB
POS Acquisition of Port Exploration Pty Ltd
28/10/15PRICE SENSITIVE download Created with Sketch. 295.4KB
POS Notice of Annual General Meeting
27/10/15 download Created with Sketch. 555.39KB
POS Annual Report to shareholders
27/10/15 download Created with Sketch. 4.15MB
POS Quarterly Report to 30 September 2015
27/10/15PRICE SENSITIVE download Created with Sketch. 1012.04KB
POS Change in substantial holding
14/10/15 download Created with Sketch. 79.2KB
POS Amended Appendix 3B
13/10/15 download Created with Sketch. 345.76KB
POS Appendix 3B
12/10/15 download Created with Sketch. 345.75KB
POS Australian Nickel Conference Presentation 2015
08/10/15 download Created with Sketch. 3MB
POS Notification to accompany Appendix 3B
14/09/15 download Created with Sketch. 34.21KB
POS Appendix 3B
14/09/15 download Created with Sketch. 370.03KB
POS Silver Swan and Funds Received
14/09/15PRICE SENSITIVE download Created with Sketch. 399.5KB
POS Update on Silver Swan & Cancellation of General Meeting
11/09/15PRICE SENSITIVE download Created with Sketch. 96.43KB
POS Appendix 4G and Corporate Governance Statement
03/09/15 download Created with Sketch. 191.18KB
POS Annual Financial Report to 30 June 2015
03/09/15 download Created with Sketch. 923.17KB
POS Extension of Completion Date
28/07/15PRICE SENSITIVE download Created with Sketch. 94.96KB
POS Extension to Silver Swan Completion
28/07/15PRICE SENSITIVE download Created with Sketch. 32.45KB
POS Concentrate Deliveries and Operational Cost Reduction
16/07/15PRICE SENSITIVE download Created with Sketch. 39.69KB
POS Quarterly Report to 30 June 2015
09/07/15PRICE SENSITIVE download Created with Sketch. 1.79MB
POS Appendix 3B
07/07/15 download Created with Sketch. 74.16KB
POS Appendix 3Y Mr Dennis
07/07/15 download Created with Sketch. 195.19KB
POS Appendix 3Y Mr Brayshaw
07/07/15 download Created with Sketch. 193.86KB
POS Appendix 3Y Mr Indermaur
07/07/15 download Created with Sketch. 195.86KB
POS Maggie Hays Mt Windarra Ore Reserve
06/07/15PRICE SENSITIVE download Created with Sketch. 1.76MB
POS Appendix 3B
30/06/15 download Created with Sketch. 351.31KB
POS Change of registry address
12/06/15 download Created with Sketch. 20.69KB
POS Change of Share Registry Address
12/06/15 download Created with Sketch. 20.69KB
POS Approval for Windarra Processing at Black Swan
09/06/15PRICE SENSITIVE download Created with Sketch. 120.27KB
POS Caeneus Minerals acquires rights to mine at Silver Swan
21/05/15PRICE SENSITIVE download Created with Sketch. 623.07KB
POS Poseidon enters into an agreement with Caeneus Minerals
20/05/15PRICE SENSITIVE download Created with Sketch. 114.13KB
POS Sale of Nickel Concentrate from Lake Johnston
19/05/15PRICE SENSITIVE download Created with Sketch. 27.34KB
POS Lake Johnston Bankable Feasibility Report Supports Restart
18/05/15PRICE SENSITIVE download Created with Sketch. 1.3MB
POS Quarterly Report to 31 March 2015
30/04/15PRICE SENSITIVE download Created with Sketch. 1.07MB
POS Appendix 3B
17/04/15 download Created with Sketch. 75.69KB
POS Appendix 3Y Mr Dennis
16/04/15 download Created with Sketch. 23.6KB
POS Appendix 3Y Mr Brayshaw
16/04/15 download Created with Sketch. 25.23KB
POS Appendix 3Y Mr Indermaur
16/04/15 download Created with Sketch. 24.21KB
POS Poseidon Completes Purchase of Black Swan
30/03/15PRICE SENSITIVE download Created with Sketch. 2.08MB
POS New Appointments
24/03/15 download Created with Sketch. 30.14KB
POS 50% Increase in Indicated Resources at Lake Johnston
17/03/15PRICE SENSITIVE download Created with Sketch. 261.05KB
POS Interim Financial Report to 31 December 2014
12/03/15 download Created with Sketch. 1.12MB
MPL +S&P DJ Indices Announces March Quarterly Review
06/03/15PRICE SENSITIVE download Created with Sketch. 100.19KB
POS High Grade Intersection at Mt Windarra
05/03/15PRICE SENSITIVE download Created with Sketch. 931.43KB
POS New Mineralised Zone Identified at Lake Johnston
18/02/15PRICE SENSITIVE download Created with Sketch. 863.3KB
POS Quartrerly Report to 31 December 2014
02/02/15PRICE SENSITIVE download Created with Sketch. 1.12MB
POS Major Resource Upgrade at Lake Johnston
29/01/15PRICE SENSITIVE download Created with Sketch. 541.65KB
POS Appendix 3B
12/01/15 download Created with Sketch. 370.31KB
POS Appendix 3Y Mr Dennis
12/01/15 download Created with Sketch. 194.96KB
POS Appendix 3Y Mr Brayshaw
12/01/15 download Created with Sketch. 197.45KB
POS Appendix 3Y Mr Indermaur
12/01/15 download Created with Sketch. 195.61KB
POS Updated Timetable for the Aquisition of Black Swan Project
18/12/14 download Created with Sketch. 28.11KB
POS Lake Johnston Restart Feasibility Study
16/12/14PRICE SENSITIVE download Created with Sketch. 927.51KB
POS Appendix 3Y - Mr Dennis
15/12/14 download Created with Sketch. 196.61KB
POS Appendix 3Y - Mr Indermaur
15/12/14 download Created with Sketch. 195.72KB
POS Appendix 3Y - Mr Brayshaw
15/12/14 download Created with Sketch. 197.47KB
POS Appendix 3Y Mr Singleton
15/12/14 download Created with Sketch. 259.28KB
POS Appendix 3B
15/12/14 download Created with Sketch. 372.69KB
POS Poseidon Announces Maggie Hays Mineral Resource
09/12/14PRICE SENSITIVE download Created with Sketch. 389.1KB
POS Change in substantial holding
08/12/14 download Created with Sketch. 78.22KB
POS Appendix 3B for 2nd Tranche Placement
05/12/14 download Created with Sketch. 132.47KB
POS Cleansing Prospectus
02/12/14 download Created with Sketch. 361.17KB
POS Addendum to the 2014 Annual Report
28/11/14 download Created with Sketch. 120.57KB
POS Results of 2014 General Meeting
26/11/14 download Created with Sketch. 147.1KB
POS Results of 2014 Annual General Meeting
26/11/14 download Created with Sketch. 166.39KB
POS Presentation at the 2014 Annual General Meeting
26/11/14 download Created with Sketch. 5.68MB
POS Recommencement of Drilling at Windarra
24/11/14PRICE SENSITIVE download Created with Sketch. 124.14KB
POS Poseidon Completes Lake Johnston Purchase
13/11/14PRICE SENSITIVE download Created with Sketch. 1.09MB
POS Appendix 3B for the Issue of Performance Bonus Shares
12/11/14 download Created with Sketch. 309.49KB
POS Revised Mt Windarra Mineral Resource
07/11/14PRICE SENSITIVE download Created with Sketch. 459.21KB
POS Black Swan Ore Reserve - ASX Request Revised Format
06/11/14 download Created with Sketch. 905.01KB
POS Poseidon Announces Black Swan Ore Reserve
05/11/14PRICE SENSITIVE download Created with Sketch. 893.36KB
POS Quarterly Report to 30 September 2014
29/10/14PRICE SENSITIVE download Created with Sketch. 1.1MB
POS 2014 Annual Report
24/10/14 download Created with Sketch. 2.49MB
POS Notice of General Meeting
24/10/14 download Created with Sketch. 370.55KB
POS Notice of Annual General Meeting
24/10/14 download Created with Sketch. 441.14KB
POS Change in substantial holding
22/10/14 download Created with Sketch. 704.41KB
POS Information Required under ASX Listing Rule 3.10.5A
16/10/14 download Created with Sketch. 95.74KB
POS Appendix 3B for Tranche 1 Placement
16/10/14 download Created with Sketch. 309.07KB
POS Cleansing Prospectus
15/10/14PRICE SENSITIVE download Created with Sketch. 343.83KB
POS Completion of $30 Million Oversubscribed Placement
10/10/14PRICE SENSITIVE download Created with Sketch. 33.43KB
POS Trading Halt
08/10/14PRICE SENSITIVE download Created with Sketch. 179.4KB
POS Presentation at Nickel Conference
02/10/14 download Created with Sketch. 2.48MB
POS Nickel Offtake Agreement Signed
02/10/14PRICE SENSITIVE download Created with Sketch. 258.95KB
POS Appendix 3B
01/10/14 download Created with Sketch. 342.19KB
POS June 2014 Annual Report
26/09/14 download Created with Sketch. 1.72MB
POS Loan Facility Extension
17/09/14PRICE SENSITIVE download Created with Sketch. 31.39KB
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $14.85M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $44.42K 10.96M

Buyers (Bids)

No. Vol. Price($)
76 35438671 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 11634354 27
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
Last
0.4¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.4¢ 0.5¢ 0.4¢ 7870983
Last updated 15.57pm 28/06/2024 ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.