Lake Wells has the potential to be one of only five large scale salt lake SOP producers around
the world and the Project’s estimated cash production costs of A$185 per tonne
(Stage 2) would be amongst the lowest in the world. The Scoping Study is based on a two stage development plan for Lake Wells:
- Stage 1 is based on shallow trenching and bore production with 100% of brine feed drawn
from the near surface Measured Resource.
- Stage 2 also includes pumping additional brine from the deeper Inferred Resource, to
increase production to 400,000 tpa of SOP.
All-in capital costs total A$268 million for the 400,000 tpa production scenario, amongst the
lowest capital intensity for any proposed potash project worldwide.
- Forums
- ASX - By Stock
- SO4
- Ann: Company Presentation-SO4.AX
Ann: Company Presentation-SO4.AX, page-15
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SO4 (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online