For a simple operation with low technical risk (e.g. DSO or basic processing), binding offtakes could potentially be signed in the context of a scoping study.
In part comes down to how rigorous the study is and appetite for risk.
Of course a full DFS is lower risk for both producer and offtaker, but the approach can be accelerated.
Independent resource estimates and rigourous testwork / trials from a bulk sample are key inputs to mitigate risk ( for producer and offtaker ).
Mine design for a simple quarrying operation should be straightforward. Key is an M&I resource and hence clear understanding of mining grade.
If DSO or simple processing then there should be low technical complexity for any onsite processing required.
All IMO.
- Forums
- ASX - By Stock
- ADN
- Ann: Letter to Shareholders
Ann: Letter to Shareholders, page-25
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
-0.001(5.88%) |
Mkt cap ! $27.14M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.8¢ | $10.17K | 1.150M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
49 | 14954233 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 18530586 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
45 | 14691733 | 0.008 |
57 | 32111369 | 0.007 |
33 | 17288156 | 0.006 |
14 | 12806000 | 0.005 |
5 | 7400000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 17430586 | 21 |
0.010 | 10364677 | 14 |
0.011 | 27346522 | 8 |
0.012 | 30045921 | 7 |
0.013 | 2310111 | 3 |
Last trade - 14.32pm 11/10/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |