I think the last paragraph is most important. Everything is on track.
The proceeds received by the Company from the sale of the Rover tenements will provide valuable funds to be put towards the completion of studies and meeting of expenditures associated with moving the Poochera Halloysite‐Kaolin Project towards development. Considerable progress is being made with the Scoping Study with the mine design finalised, production schedules prepared, engineering designs for dry‐processing at site under investigation, a high‐level transport and logistics study now complete, and financial evaluation of the various production scenarios under consideration. The Scoping Study is on track for release by the end of September.
- Forums
- ASX - By Stock
- ADN
- Ann: Sale of Rover Copper-Gold Project
Ann: Sale of Rover Copper-Gold Project, page-6
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
|
|||||
Last
2.0¢ |
Change
0.001(5.26%) |
Mkt cap ! $62.20M |
Open | High | Low | Value | Volume |
2.0¢ | 2.1¢ | 2.0¢ | $29.79K | 1.490M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8500 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 1006165 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 8500 | 0.020 |
6 | 2044249 | 0.019 |
16 | 2747234 | 0.018 |
10 | 4569549 | 0.017 |
19 | 4078241 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 1006165 | 4 |
0.022 | 2736835 | 7 |
0.023 | 503017 | 6 |
0.024 | 811838 | 9 |
0.025 | 3713056 | 14 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |