What have I missed in this PFS?
It really incredibly well.
All In Sustaining Cost (AISC) averages A$354/tonne of refined premium halloysite-kaolin product with an anticipated selling price of A$700/tonne;
Project cashflow of A$1.97B pre-tax and A$1.39B after-tax;
A 35% increase from the previous Scoping Study in pre-tax NPV8% to A$736M and unchanged IRR of 175%;Pre-production capital estimated at A$13M with a maximum cash requirement of A$28M prior to initial revenues being received;
Payback period of 15 months from commencement of mining, through Direct Shipping Ore (DSO) mining, shipping and tollrefining activities;
One of the nicest reading PFS in a while. Low capex with long mine life and the NPV compared to the current market cap leaves plenty of room for movement. I haven't bought as I've only just come across this but very keen.
- Forums
- ASX - By Stock
- ADN
- Ann: Pre-Feasibility Study Further Improves Poochera Economics
Ann: Pre-Feasibility Study Further Improves Poochera Economics, page-296
-
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.14M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $13.01K | 1.653M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
50 | 22348325 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 8394400 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
50 | 22348325 | 0.007 |
22 | 10091863 | 0.006 |
15 | 10601333 | 0.005 |
2 | 5000000 | 0.004 |
3 | 8333333 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 8394400 | 7 |
0.009 | 27580028 | 22 |
0.010 | 23847978 | 14 |
0.011 | 16613479 | 8 |
0.012 | 15258100 | 7 |
Last trade - 16.10pm 10/09/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |