COE 0.00% 23.0¢ cooper energy limited

Ann: Sole Orbost Update 19 June 2020, page-149

  1. 253 Posts.
    lightbulb Created with Sketch. 55

    I'm not sure there would be time to get a job like that done. This is a Hazardous Facility, if not a Major Hazardous Facility. Onsite permits would take time. I was thinking more along the lines of some basic, half-done cleaning job.
    I'm not a mechanical or chemical engineer but I would guess removing one absorber wouldn't really help. What's the difference between having two absorbers in series (where all the gas goes into the first absorber first, then into the second), and one absorber only (where all the gas goes into the one absorber)? In a series arrangement the same amount of gas is going into the first absorber regards of whether there's one or two.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
0.000(0.00%)
Mkt cap ! $600.6M
Open High Low Value Volume
23.0¢ 23.0¢ 22.5¢ $258.5K 1.135M

Buyers (Bids)

No. Vol. Price($)
23 548002 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 3281132 37
View Market Depth
Last trade - 14.06pm 31/07/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.