@mjalpha:
you are totally correct, the npv was for 100%, just looked it up.
sorry for the midnight quick-shot.
in that case and given your assumptions about costs there will not be to much upside , if concrete would not be included.
the only major effect of the dfs would be derisiking then?
correct, better stay on the conservative side.
sometimes you get carried away by all these additional product options.
long for longer
- Forums
- ASX - By Stock
- ADN
- Ann: Definitive Feasibility Study (DFS) update
Ann: Definitive Feasibility Study (DFS) update, page-182
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.002(10.5%) |
Mkt cap ! $65.31M |
Open | High | Low | Value | Volume |
2.0¢ | 2.1¢ | 1.8¢ | $181.5K | 9.311M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 203625 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 1192115 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 203625 | 0.020 |
3 | 866000 | 0.019 |
24 | 6210359 | 0.018 |
13 | 4658437 | 0.017 |
24 | 4190862 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 1192115 | 8 |
0.022 | 2586835 | 7 |
0.023 | 766317 | 8 |
0.024 | 1034796 | 10 |
0.025 | 4208089 | 14 |
Last trade - 16.10pm 01/08/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |