MAY 4.35% 6.6¢ melbana energy limited

Cuba Block 9: Alameda-3 Drilling Update 29 February 2024, page-319

  1. 3,095 Posts.
    lightbulb Created with Sketch. 1020
    As i said in the previous post, i asked for an update on TD and MD, all he said was planning on getting something out tomorrow, didn't elaborate on what it'll contain
    Sleep well
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
6.6¢
Change
-0.003(4.35%)
Mkt cap ! $222.4M
Open High Low Value Volume
6.8¢ 6.9¢ 6.2¢ $614.9K 9.259M

Buyers (Bids)

No. Vol. Price($)
3 371268 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 50000 1
View Market Depth
Last trade - 16.10pm 17/06/2024 (20 minute delay) ?
Last
6.7¢
  Change
-0.003 ( 2.90 %)
Open High Low Volume
6.9¢ 6.9¢ 6.4¢ 3185575
Last updated 15.57pm 17/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.