    This is very good.

    I have a couple of points that you may consider.

    Capex for stage 1 may be a little larger than 100m AUD, as the drying and bagging plant for PRM will be needed and general price of machinery and installation has increased over last year. I would say 125m AUD, maybe a bit more.
    Capex for stage 2 is not just the additional fixed plant machinery but also power lines and water piping, as well as more mobile plant items. I would say 75m AUD. Without carting water and running diesel generators Opex my drop a bit.

    Start up of stage 1 production will most probably happen at the end of FY2023.

    I think HPA capex is close to 150m AUD if done at the same site, this has not been confirmed yet and there is a chance it would be build in Adelaide as this is a bit more high tech business.

    Assuming AEM will finish their feasibility study for UK plant by the end of current FY, give them 6 months for design and funding, 12 months for construction and commissioning, 6 months to prove that the plant delivers as promised. Beginning of FY 2025 ADN can start construction and have product for sale in FY 2026.

    5N HPA is a very difficult product to manufacture so it may be a good idea to consider 90% 4N and 10% 5N for the first 4-5 years.
    I know the test results were good but scaling this up seems difficult for all others in HPA game.

    Just my speculations and I have been wrong many times.
 
watchlist Created with Sketch. Add ADN (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $23.75M
Open High Low Value Volume
0.7¢ 0.7¢ 0.7¢ $48.48K 7.056M

Buyers (Bids)

No. Vol. Price($)
65 22147619 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 12631090 12
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
ADN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.