how soon to news?, page-48

  1. 297 Posts.
    I think it will be in before then Sircorp, public comments will not cause any major delay to the UIC permit. The public comments (if any) will be addressed in the final permit.


    124.17 Response to Comments

    States are only required to issue a response to comments when a final permit is issued. The response shall specify what provision(s) of the draft permit, if any, were changed and the reason for the change(s), and briefly describe and respond to all significant comments raised during the public comment period or during any hearing. The response to comments shall be available to the public.

    A public hearing would delay the permit but one wouldn't be held without a very good reason. With the MoA between the WDEQ and USEPA I would think things would progress smoothly. The WDEQ has classified waters in the Deadwood and Flathead aquifers within the areas of review for each disposal well as Class VI.

    "WDEQ has determined that its groundwater classifications in this case conform to USEPA exemption of said portions of these aquifers under 40 CFR 146.4(a) and 146.4(b)(2). The designated Class VI waters also meet exemption criterion 146.4(c). The basis for WDEQ's groundwater classifications is described under the heading "Basis for Class VI Classification" in the attached 'Supplemental Information.' In accordance with the MoA and Wyoming's UIC program description as accepted for delegation by USEPA, please review these materials for consistency with Wyoming's groundwater classification criteria and USEPA's aquifer exemption criteria at 40 CFR 146.4 and respond to WDEQ in writing."

    UIC PROGRAM PUBLIC NOTICE REQUIREMENTS

    pursuant to 40 CFR 145.11

    124.3 Application:

    All persons requiring a permit shall complete, sign and submit an application. The Director shall not begin processing the permit until the application requirements of 144.31 have been met. Permit applications must comply with signature and certification requirements of 144.32.

    124.5 Modification, revocation and reissuance, or termination:

    Permits may be modified, etc., at the request of any person or by the Director. Permits may only be modified, etc., for reasons of 144.39 or 144.40. If a permit modification satisfies the criteria in 144.41 for a Aminor modification@ the permit may be modified without a draft permit or public notice. Otherwise a draft permit must be prepared and required procedures of Part 124 must be followed. All requests must be in writing and contain facts and reasons supporting the request. The Director shall prepare a draft permit under 124.6 after deciding to modify, etc., a permit. If an existing permit is to be revoked and reissued, a new application must be submitted. If it=s revoked and reissued, the entire permit is reopened. When a new draft permit is prepared for a permit modification, only those conditions to be modified shall be reopened. The Director also shall issue a notice when it=s decided to terminate a permit and this notice of intent is a type of draft permit and must follow 124.6 procedures.

    124.6 Draft Permits

    Once an application is complete the Director shall decide to prepare a draft permit or deny the application.If a draft permit is decided upon, it must contain the following:

    < Conditions of 144.42 and 144.51,

    < Compliance Schedules of 144.53,

    < Monitoring Requirements of 144.54, and

    < Permit Conditions of 144.52.

    Draft Permits shall be accompanied by a Fact Sheet if required under 124.8.

    124.8 Fact Sheet

    A fact sheet shall be prepared for every major UIC facility or activity and for every draft permit which the Director finds is subject to wide-spread public interest or raises major issues. The Director shall send this fact sheet to the applicant and to any other person on request. The fact sheet shall briefly describe the principle facts and significant factual, legal, methodological and policy questions considered. The fact sheet shall include:

    < brief description of the type of facility and/or activity, and< type and quantity of wastes fluids or pollutants involved, and

    < brief summary of the basis for the draft permit conditions which include statutory references, and

    < Reasons why requested variances are or are not justified, and

    < Description of procedure for reaching a final permit decision including: the start and end dates ofthe public comment period and where to send comments; procedures for requesting a hearing,

    any other procedures for public participation in a final decision, and

    < Name and telephone number of person to contact for additional information.

    124.10 Public Notice and Public Comment Period

    The Director shall give public notice that a draft permit has been prepared under 124.6, and when a hearing has been scheduled under 124.12.

    TIMING: Public notice shall allow at least 30 days for public comment. Public notice of a public

    hearing shall be given at least 30 days before the hearing.

    METHODS: Public notice shall be given by the following methods:

    1) Mailing a copy of a notice to the following persons:

    < Applicant

    < Any other agency the Director knows is required to issue RCRA, UIC, PSD, other CAA permit,

    NPDES, 404, sludge, or ocean dumping permit.

    < Federal and State agencies with jurisdiction over fish, shellfish, and wildlife resources and coastal zone management plans, State Historic Preservation Officers, the Advisory Council on Historic Preservation

    < Persons on a mailing list developed by:

    < Those who requested in writing to be on the list.

    < Soliciting persons for Aarea lists@ from participants from past permit actions in the area

    < Notification through periodic publication in public press and newsletters, bulletins or State

    law journals.

    < Any local government unit with jurisdiction over the area and each State agency with State

    authority with respect to construction or operation of such a facility, and

    2) For major permits, publication of a notice in a daily or weekly newspaper within the area affected by the

    activity or facility, and

    3) In a manner constituting legal notice under State law, and

    4) Any other method reasonably calculated to give actual notice to affected persons, including press release and other forum or medium, to elicit public participation.

    CONTENT: All public notices shall contain at a minimum:

    < Name and Address of the office processing the permit, and

    < Name and Address of permit applicant or permittee, and

    < Brief description of the proposed facility and activity, and< Name address and telephone number from whom interested parties can obtain further

    information, including copies of the draft permit, fact sheet, and application, and

    < Brief description of comment procedure required by 124.11 and 124.12, the time and place of anyhearing, any procedures to request a hearing, and any other procedures for participation on the

    final permit decision.

    Public notice for a hearing shall contain all of the preceding information, and also contain:

    < Dates of previous public notice(s) relating to the permit, and

    < Brief description of the nature and purpose of the hearing, including applicable hearing rules andprocedures.

    ADDITIONAL REQUIREMENT: In addition to the preceding general public notice content requirements, a

    copy of the fact sheet, (relevant portions of) the permit application, and the draft permit shall be mailed to

    the applicant, any agency the Director knows is required to issue RCRA, UIC, PSD, other CAA permit,

    NPDES, 404, sludge, or ocean dumping permit, and any federal and State agencies with jurisdiction over

    fish, shellfish, and wildlife resources and coastal zone management plans.

    124.11 Public Comments and Requests for hearings:

    Any interested person may submit written comments on the draft permit or permit application during the public comment period. A request for a public hearing must be in writing and state the nature of the issued proposed to be raised at the hearing. All comments shall be considered in making the final decision, and shall be answered as provided in 124.17.

    124.12 Public Hearings:

    The Director shall hold a public hearing when finding, on the basis of requests, a significant degree of public interest in a draft permit. Public notice shall be given as specificed in 124.10.

    124.17 Response to Comments

    States are only required to issue a response to comments when a final permit is issued. The response shall specify what provision(s) of the draft permit, if any, were changed and the reason for the change(s), and briefly describe and respond to all significant comments raised during the public comment period or during any hearing. The response to comments shall be available to the public.
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
(20min delay)
Last
10.5¢
Change
0.000(0.00%)
Mkt cap ! $334.6M
Open High Low Value Volume
10.0¢ 10.5¢ 10.0¢ $11.89M 113.6M

Buyers (Bids)

No. Vol. Price($)
70 8274579 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 2365100 4
View Market Depth
Last trade - 16.10pm 31/07/2024 (20 minute delay) ?
PEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.