I've assumed the Berge Namuli left on the 5th as planned (still not updated on Q-Ships). Loading and scheduling continues to work well. If the weather holds and a 31 December season end, then there should be 3 more Capesize to come (circa 540,000t) and another 3 more Self Loaders (circa 180,000t). That would put 2023 production at approx 4,800,000t - a great result and top end of guidance. If the weather is kind, they may be able to operate into January and push it to 5,000,000t
- Forums
- ASX - By Stock
- MMI
- 2023 Production Progress
2023 Production Progress, page-231
-
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.7¢ |
Change
-0.002(4.08%) |
Mkt cap ! $279.1M |
Open | High | Low | Value | Volume |
4.8¢ | 5.0¢ | 4.6¢ | $822.3K | 17.04M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 435913 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 435480 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 435913 | 0.047 |
3 | 905480 | 0.046 |
5 | 564002 | 0.045 |
5 | 1182108 | 0.044 |
5 | 657390 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 435480 | 2 |
0.050 | 8090995 | 7 |
0.051 | 3304893 | 6 |
0.052 | 2908180 | 7 |
0.053 | 1640811 | 4 |
Last trade - 16.10pm 31/07/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online