Thanks@Garant (The reply function wasn't working), glad someone knows their way around the Pilbara Ports site! Good to see a ship on the way but ideally this would be a larger ship...
The video of the Paydirt conference was released the other day too, see below. Some interesting points to note:
- @2.45 JB says "We are currently producing at a nameplate production at about 365kt". Nameplate confirmation?
- Talking over the final slide is some good timeline points. He claims stage 1 is under the belt which again implies name plate. Stage 2 in advanced plannig stages and close to implementation (unclear timing but aligns with Petra report). Feasibility study for HPMSM due Q3 CY22 (again aligns with Petra). News on potential offtake partners he looks to bring to the market shortly. Project financing for HPMSM at the end of H2 along with FID.
- Forums
- ASX - By Stock
- 99.95% High Purity Manganese
Thanks@Garant (The reply function wasn't working), glad someone...
-
- There are more pages in this discussion • 598 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add E25 (ASX) to my watchlist
(20min delay)
|
|||||
Last
34.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $74.77M |
Open | High | Low | Value | Volume |
34.0¢ | 34.0¢ | 31.5¢ | $153.5K | 464.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 7500 | 32.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
34.0¢ | 25527 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 31250 | 0.320 |
2 | 55455 | 0.315 |
2 | 4814 | 0.310 |
4 | 86527 | 0.305 |
10 | 146661 | 0.300 |
Price($) | Vol. | No. |
---|---|---|
0.340 | 25527 | 1 |
0.345 | 50000 | 2 |
0.350 | 13157 | 1 |
0.355 | 100000 | 1 |
0.360 | 8000 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
E25 (ASX) Chart |