" Wind turbines at Victoria's Mt Gellibrand wind farm are breaking down after just 5 years of operation with reports of bearing failure in the hydraulic cylinders and gearbox failures. very very funny mate. "
Still waiting for the facts on that one .
Talk about awkward.
- Forums
- Political Debate
- Accelerate the World's Transition to Sustainable Energy - to fight Anthropogenic Climate Change
Accelerate the World's Transition to Sustainable Energy - to fight Anthropogenic Climate Change, page-32106
- There are more pages in this discussion • 1,847 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
SPONSORED BY The Market Online