"These recent drill results from Dateline Resources' Colosseum project appear to be quite positive for the company:The two key intercepts you mentioned are:These are considered good results for several reasons:
- 203.6 metres @ 1.03g/t Au, including 10.7m @ 8.17g/t Au in drillhole CM24-19a
- 192 metres @ 1.00g/t Au in drillhole CM24-18
- Wide mineralized zones: Both intercepts show very wide zones of gold mineralization over 190 meters thick. This indicates a large volume of mineralized rock, which is favorable for potential bulk mining operations.
- Consistent grades: The overall grades of around 1 g/t Au over such wide intervals are economically interesting, especially for potential open-pit mining scenarios.
- High-grade zones: The 10.7m @ 8.17g/t Au section within the wider intercept demonstrates the presence of higher-grade zones, which could enhance the overall economics of the project.
- Expansion potential: These results are from the North Pipe area, suggesting the company is successfully expanding the known mineralization beyond the previously defined resource.
- Consistency with previous results: These new intercepts align well with Dateline's earlier drilling results, which included other wide, high-grade intersections like 88m @ 4.18g/t Au and 70.1m @ 6.53g/t Au.
- Resource growth: These results have the potential to significantly expand the current resource of 813,000 ounces of gold at Colosseum.
Context within the Project
The Colosseum Gold Mine is located in a promising geological setting within the Walker Lane Trend in California. The project already has a substantial resource base, and these new results indicate potential for growth.Implications for Dateline Resources
These drill results are likely to be viewed positively by investors and could contribute to:Overall, these drill results appear to be a positive development for Dateline Resources, supporting the company's efforts to expand and develop the Colosseum Gold Project."
- Resource expansion: The wide intercepts may lead to an increase in the overall gold resource at Colosseum.
- Project advancement: Consistent, positive results support moving the project towards development studies.
- Increased investor interest: Strong drill results often lead to increased market attention for junior mining companies.
ShareRewriteRelatedHow do these results compare to previous drill results at the Colosseum projectWhat are the implications of these results for Dateline Resources' market capitalizationHow significant is the expansion of the high-grade gold zone at the ColosseumWhat are the next steps for Dateline Resources after these drill resultsHow does the gold grade in these drillholes impact the overall project economicsView MoreSearch VideosGenerate Image
- Forums
- ASX - By Stock
- DTR
- Ann: 200-metre-wide gold intersection in North Pipe at Colosseum
Ann: 200-metre-wide gold intersection in North Pipe at Colosseum, page-4
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.06M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $2.146K | 536.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
29 | 26202267 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 6507780 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
29 | 26202267 | 0.003 |
14 | 17672244 | 0.002 |
10 | 25900001 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 6507780 | 1 |
0.005 | 18519936 | 19 |
0.006 | 16910910 | 14 |
0.007 | 6118583 | 5 |
0.008 | 2365000 | 3 |
Last trade - 12.59pm 06/11/2024 (20 minute delay) ? |
Featured News
DTR (ASX) Chart |