AZL 0.00% 2.3¢ arizona lithium limited

My understanding is they need to build a 60 mile pipeline for...

  1. 69 Posts.
    lightbulb Created with Sketch. 3
    My understanding is they need to build a 60 mile pipeline for power, water and to transport the lithium slurry for processing. Would not view that as perfect. If you've heard different please let me know. Infrastructure costs can be huge.
 
watchlist Created with Sketch. Add AZL (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.000(0.00%)
Mkt cap ! $88.36M
Open High Low Value Volume
2.3¢ 2.5¢ 2.2¢ $344.0K 15.35M

Buyers (Bids)

No. Vol. Price($)
2 426593 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1457380 5
View Market Depth
Last trade - 16.10pm 30/04/2024 (20 minute delay) ?
Last
2.3¢
  Change
0.000 ( 2.17 %)
Open High Low Volume
2.4¢ 2.5¢ 2.2¢ 7080023
Last updated 15.59pm 30/04/2024 ?
AZL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.