TIE 0.00% 67.5¢ tietto minerals limited

Ann: Abujar Gold Project Flyover Video Released, page-34

  1. 2,797 Posts.
    lightbulb Created with Sketch. 585
    This video would be more convincing is they labelled some key components such as the SAG mill.
    Tietto secured a single‐stage SAG mill for its Abujar Project which was originally manufactured in 2008 but never put into operation and has been in storage in Australia for the last 12 years. Grinding company NCP International Ltd has transported the mill components to Johannesburg for a full inspection and refurbish. NCP International was on track to refurbish this unused 11.5MW single stage SAG mill for shipping to site in Q1 2022.
    Where is it?
 
watchlist Created with Sketch. Add TIE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.