This announcement is for the GridPack design. How can economics be completed on a project where the product design has just been completed? It's all part of preparing the DFS. The JV was announced in September 2022. If you can do economics on a project at this stage you must have a crystal ball, be speculating or be premature.
- Forums
- ASX - By Stock
- Ann: Altech - Launch of CERENERGY 1.0MWh GridPack Design
This announcement is for the GridPack design. How can economics...
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATC (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $102.5M |
Open | High | Low | Value | Volume |
6.2¢ | 6.2¢ | 6.2¢ | $1.288K | 20.78K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 465431 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.3¢ | 29535 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 20002 | 0.063 |
5 | 466210 | 0.062 |
11 | 1003024 | 0.061 |
17 | 942104 | 0.060 |
8 | 357967 | 0.059 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 20781 | 3 |
0.063 | 29535 | 1 |
0.064 | 1224930 | 6 |
0.065 | 717841 | 6 |
0.066 | 150000 | 1 |
Last trade - 10.00am 21/05/2024 (20 minute delay) ? |
|
|||||
Last
6.2¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
6.2¢ | 6.2¢ | 6.2¢ | 25892 | ||
Last updated 10.02am 21/05/2024 ? |
Featured News
ATC (ASX) Chart |