AAU 0.00% 0.4¢ antilles gold limited

Ann: Antilles Gold Commences Review of Copper/Gold Deposits, Cuba, page-29

  1. 1,900 Posts.
    lightbulb Created with Sketch. 650
    Based on the most recent investor presentation
    • The first 15,000m stage of a 25,000m drilling program has been completed, and recorded excellent gold and silver
    grades and thick intercepts of mineralization. The upper range of the global Exploration Target for the La
    Demajagua ore body of 20.0mt of ore grading 3.0 g/t Au equivalent (1.9 million oz Au equivalent) could be
    exceeded (refer Annex 1).
    • The second stage 10,000m program will commence in October 2021 and be completed in three months with initial
    JORC Resources to be published in November 2021 with a revision in February 2022.

    Results due any day its six weeks since last set, so hoping tomorrow.

    Jorc due Nov, and then to be revised after this next set of drilling which starts in Oct.
    Last edited by watchitgonow: 30/09/21
 
watchlist Created with Sketch. Add AAU (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $5.114M
Open High Low Value Volume
0.3¢ 0.4¢ 0.3¢ $3.864K 1.265M

Buyers (Bids)

No. Vol. Price($)
61 59401240 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 29148219 26
View Market Depth
Last trade - 15.55pm 31/07/2024 (20 minute delay) ?
AAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.