HIGHLIGHTS
• The depth of the mineralised Tolubay Suite has increased significantly on section 8 at Obdilla, highlighting the potential for a substantial gold resource to be delineated.
• The 241m deep hole ZDDH034 intercepted 203m at 1.8g/t Au from surface, with assays awaited for the bottom 38m of the hole, which was terminated prior to reaching the footwall of massive limestone.
• Hole ZDDH035 ended at 290m, still in the Tolubay Suite - results are awaited for this hole and holes ZDDH036 and ZDDH037.
• Intercepts from two shallower holes on section 8 included 74m at 1.8g/t (including 17m at 4.2 g/t) and 74m at 1.4g/t Au.
• The target zone gets wider as well as deeper to the west. It is 150m wide at planned section 9, located 115m west of section 8 - drilling will start shortly.
- Forums
- ASX - By Stock
- PRU
- more big gold intersections
more big gold intersections
Featured News
Add PRU (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.35 |
Change
0.060(2.62%) |
Mkt cap ! $3.255B |
Open | High | Low | Value | Volume |
$2.32 | $2.39 | $2.32 | $13.37M | 5.685M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 349293 | $2.35 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.36 | 4383 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 349293 | 2.350 |
13 | 335697 | 2.340 |
7 | 95236 | 2.330 |
2 | 52320 | 2.320 |
2 | 17454 | 2.310 |
Price($) | Vol. | No. |
---|---|---|
2.360 | 4383 | 2 |
2.370 | 378338 | 11 |
2.380 | 159649 | 6 |
2.390 | 104542 | 8 |
2.400 | 45309 | 4 |
Last trade - 16.10pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
$2.36 |
  |
Change
0.060 ( 3.19 %) |
|||
Open | High | Low | Volume | ||
$2.34 | $2.39 | $2.34 | 805817 | ||
Last updated 15.59pm 31/05/2024 ? |
Featured News
PRU (ASX) Chart |