MAY 6.82% 2.4¢ melbana energy limited

luv the update!!!very slow going though.....thoughts on why the...

  1. 3,707 Posts.
    lightbulb Created with Sketch. 1095
    luv the update!!!
    https://hotcopper.com.au/data/attachments/6055/6055289-15d24a1522e66090baf51b3d67a4b82b.jpg

    very slow going though.....thoughts on why the slow rate of progress???

    "Drilling ahead continues in 8-1/2” hole and is currently at 3120 metres MD enroute to the first coring point planned for 3211 metres MD, after which drilling ahead will continue to the final planned casing point in the seal above the Marti Structure, planned for ~3586 metres MD."

    12 March 2024: 3045mMD
    25 March 2024: 3120mMD

    13 DAYS!!! 75M!!! BARELY ~6M A DAY!???!!

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.002(6.82%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.2¢ 2.4¢ 2.2¢ $11.47K 505.7K

Buyers (Bids)

No. Vol. Price($)
2 4101962 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3023055 15
View Market Depth
Last trade - 14.23pm 31/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.