EXR 0.00% 10.0¢ elixir energy limited

And a potential new sub-basin / extension of the Nomgon basin...

  1. 127 Posts.
    lightbulb Created with Sketch. 125
    And a potential new sub-basin / extension of the Nomgon basin with decent coal at Big-Slope (only ~10-12km away) and between Nomgon and Yangir.

    I've got November 15th pencilled in as when they'll announce start of dewatering etc. based on their previous timeframe + delays with storms etc.

    Really hoping SP stabilises here and then re-rates on general CBM Ops update, Quarterly, H2 report and potentially some news re: QLD asset.

    https://hotcopper.com.au/data/attachments/4747/4747048-0b2e38122bcc85d775d59ad381b1a9c1.jpg

 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
0.000(0.00%)
Mkt cap ! $116.2M
Open High Low Value Volume
10.0¢ 10.5¢ 9.7¢ $205.5K 2.050M

Buyers (Bids)

No. Vol. Price($)
4 591879 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 979450 6
View Market Depth
Last trade - 13.51pm 31/07/2024 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.