CCZ 0.00% 0.5¢ castillo copper limited

Ann: Drilling logistics largely finalised at Mt Oxide Project, page-25

  1. 67 Posts.
    lightbulb Created with Sketch. 13
    CCZ threads have been largely free of childish bickering up to this point. Beginning to see some pollution creeping in and muddying the waters. Down-rampers and up-rampers are all welcome if the argument has some kind of factual basis.

    Stick to the topic (CCZ) ..
 
watchlist Created with Sketch. Add CCZ (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $6.497M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $3.94K 928.0K

Buyers (Bids)

No. Vol. Price($)
28 10708643 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 2189571 7
View Market Depth
Last trade - 15.21pm 31/07/2024 (20 minute delay) ?
CCZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.