SPR 0.00% 57.5¢ spartan resources limited

Most of these costs are already calculated in to AISC, hence...

  1. 164 Posts.
    lightbulb Created with Sketch. 5
    Most of these costs are already calculated in to AISC, hence only the additional carting distance will be added. I believe ore will be transported using road trains. Fuel consumption 1 liter for 1 km, load capacity of 160tons. Going by those figures I calculated it to be around 1.2cents just for the fuel per ton. But maintaining trucks not that cheap either. Insurance, fixed costs of obtaining trucks. IMO I believe it will be (roughly) less than $20 per km run 160 tons of ore.
    I appollogise for not putting calculations nicely.
    So as for me it came to around 13 cents per ton added costs for trucking
 
watchlist Created with Sketch. Add SPR (ASX) to my watchlist
(20min delay)
Last
57.5¢
Change
0.000(0.00%)
Mkt cap ! $623.9M
Open High Low Value Volume
58.0¢ 59.0¢ 57.5¢ $1.770M 3.050M

Buyers (Bids)

No. Vol. Price($)
6 169711 57.5¢
 

Sellers (Offers)

Price($) Vol. No.
58.5¢ 93960 2
View Market Depth
Last trade - 16.10pm 02/05/2024 (20 minute delay) ?
Last
57.5¢
  Change
0.000 ( 0.67 %)
Open High Low Volume
58.5¢ 59.0¢ 57.5¢ 1340392
Last updated 15.59pm 02/05/2024 ?
SPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.