Toolkit is active with a vengeance creating confusion, seriously come up with better thing next time, what is the issue here
Detailed feasibility studies are the most detailed and will determine definitively whether to proceed with the project. A detailed feasibility study will be the basis for capital appropriation and will provide the budget figures for the project. Detailed feasibility studies require a significant amount of formal engineering work, are accurate to within 10-15% and can cost between ½-1½% of the total estimated project cost.
- Forums
- ASX - By Stock
- ASN
- Ann: Further Increases in Lithium Grades at Paradox Project
Ann: Further Increases in Lithium Grades at Paradox Project, page-181
-
- There are more pages in this discussion • 131 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
-0.005(4.17%) |
Mkt cap ! $151.6M |
Open | High | Low | Value | Volume |
11.5¢ | 11.8¢ | 11.5¢ | $35.36K | 307.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 131367 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 452705 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 133267 | 0.115 |
17 | 1277710 | 0.110 |
18 | 1058691 | 0.105 |
33 | 2985220 | 0.100 |
4 | 210690 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 452705 | 9 |
0.125 | 406883 | 6 |
0.130 | 250816 | 8 |
0.135 | 250543 | 5 |
0.140 | 333720 | 3 |
Last trade - 10.56am 31/07/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online