GNX 0.00% 27.5¢ genex power limited

Says on this link that it should be in service by end of...

  1. 156 Posts.
    lightbulb Created with Sketch. 19
    Says on this link that it should be in service by end of September.

    https://leadertoday.com.au/news/2023/07/23/bouldercombes-big-bessie-goes-live/

    Speaking on site at Bouldercombe, Genex Power chief operations officer Arran McGhie said construction had started on the 50MW Genex Bouldercombe Battery Project in mid-2022.
    With Big Bessie now fully operational, the battery will undergo testing over the next six to eight weeks and should be fully commissioned by the end of September
 
watchlist Created with Sketch. Add GNX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.