SFX 0.52% 48.3¢ sheffield resources limited

Turnkey basisEPC contract in place for ore processing plant...

  1. 875 Posts.
    lightbulb Created with Sketch. 68

    Turnkey basis

    EPC contract in place for ore processing plant significantly de-risks project execution

    Engineering, Procurement and Construction (“EPC”) contract in place with GR Engineering Services Limited (“GRES”) to deliver the process plant and associated infrastructure on a turnkey basis

    De-risked project delivery with lump sum, fixed price contract (A$366m) which covers approximately 80% of estimated Stage 1 total development capital costs

    GRES to assume substantial performance and metallurgical guarantees

    Construction ready with completion of 100% of process design, site and plant layouts, general arrangements, earthworks and structural design (includes mechanical and electrical equipment specifications, vendor pricing confirmation, procurement plan and detailed project execution plans)

    Peer review of all design and engineering completed to date Next steps involve site mobilisation and procurement

 
watchlist Created with Sketch. Add SFX (ASX) to my watchlist
(20min delay)
Last
48.3¢
Change
-0.003(0.52%)
Mkt cap ! $190.6M
Open High Low Value Volume
48.5¢ 48.5¢ 48.0¢ $280 579

Buyers (Bids)

No. Vol. Price($)
1 2834 48.0¢
 

Sellers (Offers)

Price($) Vol. No.
48.5¢ 15016 2
View Market Depth
Last trade - 12.31pm 20/05/2024 (20 minute delay) ?
Last
48.5¢
  Change
-0.003 ( 0.00 %)
Open High Low Volume
48.5¢ 48.5¢ 48.5¢ 4500
Last updated 12.25pm 20/05/2024 ?
SFX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.