Turnkey basis
EPC contract in place for ore processing plant significantly de-risks project execution
• Engineering, Procurement and Construction (“EPC”) contract in place with GR Engineering Services Limited (“GRES”) to deliver the process plant and associated infrastructure on a turnkey basis
• De-risked project delivery with lump sum, fixed price contract (A$366m) which covers approximately 80% of estimated Stage 1 total development capital costs
• GRES to assume substantial performance and metallurgical guarantees
• Construction ready with completion of 100% of process design, site and plant layouts, general arrangements, earthworks and structural design (includes mechanical and electrical equipment specifications, vendor pricing confirmation, procurement plan and detailed project execution plans)
• Peer review of all design and engineering completed to date• Next steps involve site mobilisation and procurement
- Forums
- ASX - By Stock
- Ann: Informa Mineral Sands Conference Presentation
Turnkey basisEPC contract in place for ore processing plant...
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
48.3¢ |
Change
-0.003(0.52%) |
Mkt cap ! $190.6M |
Open | High | Low | Value | Volume |
48.5¢ | 48.5¢ | 48.0¢ | $280 | 579 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2834 | 48.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
48.5¢ | 15016 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2834 | 0.480 |
2 | 26323 | 0.475 |
3 | 9518 | 0.470 |
1 | 10752 | 0.465 |
2 | 25250 | 0.460 |
Price($) | Vol. | No. |
---|---|---|
0.485 | 15016 | 2 |
0.490 | 25274 | 3 |
0.495 | 50521 | 2 |
0.500 | 255949 | 2 |
0.505 | 9002 | 1 |
Last trade - 12.31pm 20/05/2024 (20 minute delay) ? |
|
|||||
Last
48.5¢ |
  |
Change
-0.003 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
48.5¢ | 48.5¢ | 48.5¢ | 4500 | ||
Last updated 12.25pm 20/05/2024 ? |
Featured News
SFX (ASX) Chart |