Nickel production can't justify new rail, becasue it's not sold in sufficient volume. I couldn't find production figures in a 5 minute look, but Mt Keith and Leinster have reserves of around 1 MT total. They both have nickel concentrators, so IIRC they produce a 20% Nickel concentrate. So if they produced their entire reserves in one year they'd have 5 MT to throw on the line... If we built it I imagine they'd jump on it, but it's a different kettle of fish to even GWR by itself, currently licensed for 7 MTPa with a realistic possibility of going higher.
- Forums
- ASX - By Stock
- GWR
- Ann: Infrastructure for Long Term Production - Desk Top Study
Ann: Infrastructure for Long Term Production - Desk Top Study, page-23
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
|
|||||
Last
8.0¢ |
Change
0.003(3.90%) |
Mkt cap ! $25.69M |
Open | High | Low | Value | Volume |
8.2¢ | 8.2¢ | 8.0¢ | $14.48K | 176.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 258275 | 7.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 121160 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 258275 | 0.076 |
1 | 41666 | 0.072 |
1 | 14285 | 0.070 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 121160 | 2 |
0.082 | 106612 | 1 |
0.085 | 200000 | 1 |
0.091 | 1260 | 1 |
0.095 | 107746 | 1 |
Last trade - 10.05am 31/07/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online