The timeframe works out very well because:
I would think 36 months to do all the studies required, noting the feedstock part of the equation is already defined. That means focus is on design of plant (based on the UK design) and determining where to locate it ( maybe Whyalla or Adelaide ). They would only be transporting a fraction of the production output from Great White to location for a HPA Plant.
- Great White achieves revenue / cashflow mid-2022
- Great White achieves payback say mid-2023
- Allow say another 12 months at full production to bed down cash reserves
- Then fund / finance a HPA Plant
- Then first HPA production 2025 or 2026 - just as demand curve accelerates.
- Forums
- ASX - By Stock
- Ann: Investor Presentation
The timeframe works out very well because: Great White achieves...
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.001(5.88%) |
Mkt cap ! $55.98M |
Open | High | Low | Value | Volume |
1.8¢ | 1.8¢ | 1.7¢ | $45.16K | 2.593M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 13078772 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 1052827 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 13078772 | 0.017 |
32 | 7184004 | 0.016 |
16 | 4219095 | 0.015 |
4 | 1144278 | 0.014 |
4 | 2776923 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 1052827 | 8 |
0.019 | 3541794 | 13 |
0.020 | 4903315 | 18 |
0.021 | 3039035 | 7 |
0.022 | 1333479 | 6 |
Last trade - 16.10pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
1.7¢ |
  |
Change
0.001 ( 2.86 %) |
|||
Open | High | Low | Volume | ||
1.8¢ | 1.8¢ | 1.7¢ | 684400 | ||
Last updated 15.49pm 31/05/2024 ? |
Featured News
ADN (ASX) Chart |