DEL 4.00% 4.8¢ delorean corporation limited

The other clear piece of spin coming out of this investor...

  1. 188 Posts.
    lightbulb Created with Sketch. 84
    The other clear piece of spin coming out of this investor presentation on page 8 it says:

    "Powercor electricity grid technical report complete''. That means absolutely nothing and a consultant can bring that together for a few thousand dollars.

    What we need is an executed Generator Deed (template available off the Powercor website dating back to 2021):
    https://media.powercor.com.au/wp-content/uploads/2021/04/30100722/Generator-Deed-Retail-Customers-Updated-April-2021.pdf

    Any generator connecting to the Powercor network requires this Deed along with all of the technical schedules.

    Once this has been executed then we know for sure the grid workstream has been completed for VIC 1.

    I think DEL has a few extra hundred thousand dollars to be spending on grid to get to this stage.

 
watchlist Created with Sketch. Add DEL (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
-0.002(4.00%)
Mkt cap ! $10.35M
Open High Low Value Volume
4.8¢ 4.8¢ 4.8¢ $1.68K 35K

Buyers (Bids)

No. Vol. Price($)
3 457000 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 30000 1
View Market Depth
Last trade - 10.02am 24/05/2024 (20 minute delay) ?
Last
4.8¢
  Change
-0.002 ( 2.04 %)
Open High Low Volume
4.8¢ 4.8¢ 4.8¢ 1190
Last updated 13.11pm 24/05/2024 ?
DEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.