HIGHLIGHTS
• The depth of the mineralised Tolubay Suite has increased significantly on section 8 at Obdilla, highlighting the potential for a substantial gold resource to be delineated.
• The 241m deep hole ZDDH034 intercepted 203m at 1.8g/t Au from surface, with assays awaited for the bottom 38m of the hole, which was terminated prior to reaching the footwall of massive limestone.
• Hole ZDDH035 ended at 290m, still in the Tolubay Suite - results are awaited for this hole and holes ZDDH036 and ZDDH037.
• Intercepts from two shallower holes on section 8 included 74m at 1.8g/t (including 17m at 4.2 g/t) and 74m at 1.4g/t Au.
• The target zone gets wider as well as deeper to the west. It is 150m wide at planned section 9, located 115m west of section 8 - drilling will start shortly.
- Forums
- ASX - By Stock
- PRU
- more big gold intersections
more big gold intersections
Featured News
Add PRU (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.29 |
Change
-0.100(4.18%) |
Mkt cap ! $3.145B |
Open | High | Low | Value | Volume |
$2.36 | $2.39 | $2.28 | $12.99M | 5.611M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 131462 | $2.28 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.30 | 31917 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 11180 | 2.280 |
5 | 76673 | 2.270 |
5 | 44852 | 2.260 |
7 | 58691 | 2.250 |
2 | 8266 | 2.240 |
Price($) | Vol. | No. |
---|---|---|
2.300 | 31917 | 5 |
2.310 | 80987 | 4 |
2.320 | 44192 | 3 |
2.330 | 7820 | 1 |
2.340 | 57820 | 2 |
Last trade - 16.10pm 30/05/2024 (20 minute delay) ? |
|
|||||
Last
$2.29 |
  |
Change
-0.100 ( 4.24 %) |
|||
Open | High | Low | Volume | ||
$2.37 | $2.39 | $2.28 | 1298625 | ||
Last updated 15.59pm 30/05/2024 ? |
Featured News
PRU (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online