Beginning with its Great White Kaolin Project located near Poochera on the Eyre Peninsula (Figure 2), Andromeda anticipates gaining approval to start construction in 2022. For an 18-month period post construction, Andromeda plans to export up to 600,000 tonnes per year of direct shipping ore (DSO) halloysite-kaolin clay with the product trucked to its desired export port facility of choice using either triple or quad road trains with side tipping capabilities, similar to those used to transport the region’s grain production
- Forums
- ASX - By Stock
- ADN
- Ann: IRD: Iron Rd & Andromeda Metals to Collaborate on Cape Hardy
Ann: IRD: Iron Rd & Andromeda Metals to Collaborate on Cape Hardy, page-2
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
0.001(5.56%) |
Mkt cap ! $59.09M |
Open | High | Low | Value | Volume |
1.8¢ | 1.9¢ | 1.7¢ | $55.25K | 3.070M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 704412 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 1205531 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 704412 | 0.018 |
18 | 7363116 | 0.017 |
44 | 9440336 | 0.016 |
25 | 5560550 | 0.015 |
5 | 1458544 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 1205531 | 5 |
0.020 | 2419508 | 19 |
0.021 | 4330830 | 7 |
0.022 | 1730273 | 8 |
0.023 | 1051330 | 6 |
Last trade - 16.10pm 09/05/2024 (20 minute delay) ? |
|
|||||
Last
1.8¢ |
  |
Change
0.001 ( 2.70 %) |
|||
Open | High | Low | Volume | ||
1.8¢ | 1.9¢ | 1.7¢ | 3483208 | ||
Last updated 15.21pm 09/05/2024 ? |
Featured News
ADN (ASX) Chart |