PEN peninsula energy limited

Why couldn't the resin just be stored until the back end was...

  1. 10,526 Posts.
    lightbulb Created with Sketch. 1101
    Why couldn't the resin just be stored until the back end was complete,... Is there a technical reason???

    Why did production in MU1 and 2 have to stop.!!! This was only going to be a small amount of Uranium resin, I dont understand Wayne stop start reason not moving forward on those two 2 mine units.

    Operational Milestones
    The Company previously reported the establishment of limited scale pre-production circulating flows
    using existing chemical delivery systems. Well patterns in MU-1 are being pre-acidified and readied for
    production operations. A booster pump has been received, installed, and commissioned to allow
    significantly enhanced recirculation flowrates for preconditioning. Currently, an operation flowrate of
    approximately 500 gallons per minute (GPM) has been established. Flowrates will continue to be
    increased throughout May and June.
    The large volume acid storage and distribution system is expected to be available for use by mid-May.
    When commissioned, the new systems will facilitate higher concentrations of acid, further accelerating
    the preconditioning operations.
    Currently, the preconditioning process stream is not being directed to the production plant, and no
    uranium is being recovered in the plant circuits. Uranium concentrations are expected to build throughout
    the pre-conditioning operations, and it is currently projected that the process plant will be activated for
    commercial uranium production activities by mid-year 2023.
    Last edited by phishpheet: 13/09/23
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.