correct Rothesay goes to Deflector via Perenjori and Morawa - mostly sealed except a bit at the Perenjori end to the mine.
limited to 36.5m road trains - they have tried to increase the size but local shires ( 3 of them ) and main rds have said no dice. Yalgoo to defector is sealed - is actually the better part of the road - a lot of it is single lane seal.
- Forums
- ASX - By Stock
- Ann: More outstanding high-grade assay results
correct Rothesay goes to Deflector via Perenjori and Morawa -...
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
66.5¢ |
Change
0.030(4.72%) |
Mkt cap ! $724.3M |
Open | High | Low | Value | Volume |
66.0¢ | 68.0¢ | 64.5¢ | $4.620M | 6.982M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 17810 | 70.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
60.0¢ | 5774 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 39262 | 0.665 |
14 | 243691 | 0.660 |
7 | 83601 | 0.655 |
15 | 139711 | 0.650 |
6 | 47844 | 0.645 |
Price($) | Vol. | No. |
---|---|---|
0.670 | 124761 | 13 |
0.675 | 109414 | 8 |
0.680 | 288862 | 12 |
0.685 | 286408 | 8 |
0.690 | 144728 | 10 |
Last trade - 15.59pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
66.5¢ |
  |
Change
0.030 ( 4.17 %) |
|||
Open | High | Low | Volume | ||
65.5¢ | 68.0¢ | 64.5¢ | 1269810 | ||
Last updated 15.59pm 15/05/2024 ? |
Featured News
SPR (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online