"I was under the impression that this process, once initiated can take merely 24 hours"
-TLC operations are slow.
- Take time for a bit trip and add in a few extra hours for slower pipe speed while tripping with wireline cable attached to the tool. 10- 12 hours normal two way trip time plus extra
- Add in logging time. Again take normal time you'd take to run the tool on wireline and add on a whole lot of extra time to allow for the fact you're tripping pipe every time you move the tool.
If they've already acquired pressures then a sampling only (say 12 stations) run on TLC would take a minimum of 1-1/2 days...more likely 2 days.
If the have to acquire pressures then add on more time for that.
- Forums
- ASX - By Stock
- Ann: Mukuyu-2 fluid sampling progress update
"I was under the impression that this process, once initiated...
-
-
- There are more pages in this discussion • 2,157 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.6¢ |
Change
0.002(2.70%) |
Mkt cap ! $112.2M |
Open | High | Low | Value | Volume |
7.6¢ | 7.6¢ | 7.6¢ | $1.015K | 13.35K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 16653 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 10600 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 203 | 0.076 |
2 | 16653 | 0.075 |
1 | 119339 | 0.074 |
2 | 120000 | 0.073 |
2 | 77488 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 202 | 1 |
0.076 | 13157 | 1 |
0.077 | 10600 | 1 |
0.078 | 115267 | 1 |
0.080 | 94368 | 4 |
Last trade - 10.04am 04/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |