@Kiwigeo8339, a question for you (trying to understand )
so logging via TLC involves using drill pipe and then we reach the desired point (station),the MDT is still running on wireline cable is suspended from the drill pipe to take pressure readings and samples, if there is differential sticking as experienced how is that mitigated, given that the MDT is out of the drill pipe (still on wireline) and under the same conditions?
Thanks
- Forums
- ASX - By Stock
- Ann: Mukuyu-2 fluid sampling progress update
@Kiwigeo8339, a question for you (trying to understand )so...
-
-
- There are more pages in this discussion • 441 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.3¢ |
Change
0.003(5.00%) |
Mkt cap ! $92.50M |
Open | High | Low | Value | Volume |
6.1¢ | 6.3¢ | 6.0¢ | $68.18K | 1.103M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 231957 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 224816 | 0.063 |
2 | 320000 | 0.062 |
1 | 4000000 | 0.061 |
8 | 799268 | 0.060 |
9 | 761109 | 0.059 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 38333 | 2 |
0.066 | 60623 | 1 |
0.067 | 97834 | 1 |
0.068 | 117728 | 4 |
0.069 | 155000 | 1 |
Last trade - 13.05pm 13/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online