IVZ 1.64% 6.2¢ invictus energy ltd

On wireline you'd normally acquire pressures first working down...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    On wireline you'd normally acquire pressures first working down and then take samples coming back out. If youre running TLC you might change that plan to minimize movement of the drill pipe or for other reasons.

    Its possible enough pressures (minimum of 3 generally) were taken to enable confirmation of a gas gradient and also to select a sample point with decent mobility.

    Hard to ascertain what pressures have been acquired with the available data.
    Last edited by Kiwigeo8339: 13/11/23
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.2¢
Change
0.001(1.64%)
Mkt cap ! $87.91M
Open High Low Value Volume
6.3¢ 6.3¢ 6.1¢ $61.7K 998.0K

Buyers (Bids)

No. Vol. Price($)
2 220644 6.1¢
 

Sellers (Offers)

Price($) Vol. No.
6.2¢ 101155 1
View Market Depth
Last trade - 16.10pm 27/06/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.