TOE 2.94% 33.0¢ toro energy limited

Ann: Next phase drilling at Dusty Nickel Project, page-23

  1. 196 Posts.
    lightbulb Created with Sketch. 167
    he link shows the change in positions of all the big players

    Last edited by Swanssm: 07/03/21
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
(20min delay)
Last
33.0¢
Change
-0.010(2.94%)
Mkt cap ! $39.69M
Open High Low Value Volume
34.0¢ 34.0¢ 33.0¢ $46.31K 138.2K

Buyers (Bids)

No. Vol. Price($)
2 12856 33.0¢
 

Sellers (Offers)

Price($) Vol. No.
34.0¢ 19967 1
View Market Depth
Last trade - 16.10pm 04/06/2024 (20 minute delay) ?
Last
33.5¢
  Change
-0.010 ( 2.90 %)
Open High Low Volume
34.0¢ 34.0¢ 33.0¢ 35854
Last updated 15.59pm 04/06/2024 ?
TOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.