The ML notes a requirement for Stage 1 processing of 6.5L/s to be brought in via a pipeline from the SA Main DN200 pipeline from Streaky Bay.Stage 2 processing requires 10L/s via an upgraded connection to a the SA Main in Poochera DN675 trunk.
The preliminary design included in Appendix 3 has the the details.
Also section 2.3.2 of the ML notes SA water is currently investigating a 15ML/d desalination plant to boost existing capacity.
- Forums
- ASX - By Stock
- ADN
- Ann: Noosa Mining & Exploration Investor Conference Presentation
Ann: Noosa Mining & Exploration Investor Conference Presentation, page-162
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
-0.001(7.69%) |
Mkt cap ! $20.57M |
Open | High | Low | Value | Volume |
0.6¢ | 0.7¢ | 0.6¢ | $26.59K | 4.398M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 8106342 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 8773977 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 5488342 | 0.006 |
38 | 21230557 | 0.005 |
9 | 10350000 | 0.004 |
7 | 12334995 | 0.003 |
7 | 15650497 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 8773977 | 21 |
0.008 | 6757996 | 18 |
0.009 | 16820355 | 21 |
0.010 | 4296882 | 7 |
0.011 | 27266522 | 7 |
Last trade - 15.58pm 08/11/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online