The Scheme Booklet lodged with ASIC on 14 Feb is not "incomplete".
It is complete but a draft pending approval by ASIC, so that the First Hearing Date can proceed, etc etc etc.
As explained by others the time extension is purely procedural to not fall foul of the statutory time limits.
There should be no doubt from anyone this change of control is proceeding, one way or the other.
God bless Gina - I'll get my 12 month CGT discount.
GLTAH!
- Forums
- ASX - By Stock
- Ann: Notice from SH Mining Pty Ltd - ASIC Relief
The Scheme Booklet lodged with ASIC on 14 Feb is not...
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.69 |
Change
0.000(0.00%) |
Mkt cap ! $1.692B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AZS (ASX) Chart |
Day chart unavailable