88E 0.00% 0.2¢ 88 energy limited

Ann: Operations Update, page-142

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Quacker,

    That vehicle permit is for a CT crane arriving onsite. The drillrig was already demobilised. There should also b a Coil Tubing express (truck with a large drum/spool of tubing) that should move into position. The Crane acts as a hoist when needed, while setting up the gear thro' the well head.

    CT operation basically eliminates the need to have a rig onsite & saves heaps of time for an Operator. They'll pressure test all the equipment b4 perforating the 4.5" liner in the relevant zones of interest & then follow it up with the rest of the Frac procedure etc.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 2000000 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.1¢ 100000 1
View Market Depth
Last trade - 09.45am 29/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.