ESS 0.00% 50.0¢ essential metals limited

This is what we are all waiting for, CADE and DAVY shallow...

  1. 214 Posts.
    lightbulb Created with Sketch. 481


    This is what we are all waiting for, CADE and DAVY shallow drilling Pegs to come in mineralised.
    Announcement of results should be in within the week

    If mineralised it should add to the resource as I wouldn't have thought the top 50-60m oxidized zone would NOT have been included in previous resource calculations.


    CADE central

    https://hotcopper.com.au/data/attachments/3508/3508157-36840bb3b6683d7db604618631831c0f.jpg

    https://hotcopper.com.au/data/attachments/3508/3508241-8dd43cc16cd707b9f257b50dfd845076.jpg

    https://hotcopper.com.au/data/attachments/3508/3508140-3f21a58a28f93ed17606bfc2082a54e3.jpg
    DAVY

    https://hotcopper.com.au/data/attachments/3529/3529242-b314845beaa76b712f443a9a9d914acd.jpg

    https://hotcopper.com.au/data/attachments/3529/3529250-e6335a9a7c2948757a5e88f45fe505d3.jpg

    From the last round of drilling - those up-dip drills to test near surface mineralization

    https://hotcopper.com.au/data/attachments/3529/3529256-98534f3ff2835b55f3fc6522a0f767d6.jpg
    The rig shot here is Drilling on Davy - PDRC519 - from 14 -53 meters, drill samples usually placed in rows of 10.

    https://hotcopper.com.au/data/attachments/3529/3529270-bd8365e465720dbf6f9830c250ce5ac8.jpg

    This looks like fresh peg to me from about 14m - this means it should be mineralized

    Remembering if we have fresh Peg as per shallow hole PDAC386 (below) (in Cade) from 4-25 meters it should be mineralized - 21m at 1.78%Li2O
    Because its thick intersection it has a higher weathering resistance so it should be fresh and mineralized


    https://hotcopper.com.au/data/attachments/3529/3529307-ebdf8be8e58bdfea2fbe4cf2fbdd64ec.jpg

    https://hotcopper.com.au/data/attachments/3529/3529416-5e5c95aa4c37cb9330b4318bad5c7ed0.jpg

    2.3Mt at 1.13%Li2O
    https://hotcopper.com.au/data/attachments/3529/3529369-ad577967eb92ca8a30b81778045aa2b8.jpg
    So the two new drills PDR518, 519 close to surface, I've attempted to place on an company 3d model of Davy - this may add to resource and/or to the to Indicated category. The 39meters encountered is only an exaggerated apparent thickness due to the angle of dip/plunge of the Pegmatite and angle of the drilling - my estimates of true thickness somewhere around 20-25m.


    Good Luck all


 
watchlist Created with Sketch. Add ESS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.